Bunn Sure Immersion 220 Installation & Operating Manual page 10

Bean to cup coffee system
Hide thumbs Also See for Sure Immersion 220:
Table of Contents

Advertisement

4. With the handle in the vertical position, slide the
Filter Paper through the guide.
5. Next, pull the Filter Paper through the slot in
the Paper Roller.
6. Push the Paper Roller in until it engages the
roller drive.
7. Then turn the handle clockwise to the
horizontal position.
FILTER PAPER INSTALLATION
1
10
7
6
4
5
continued >

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

44400.0100

Table of Contents