Siemens MOBILETT Plus Service Instructions Manual page 93

Hide thumbs Also See for MOBILETT Plus:
Table of Contents

Advertisement

Mechanical systems
Adjustment
screw
Fig. 18
Relieve the spring tension by loosening the adjustment screw (Fig. 18).
Remove all collimator covers and grounding cables.
Disconnect all cables to the collimator.
Cut the cable ties (see Page 9 - 5).
Remove the collimator.
Disconnect all electrical connections to the single tank.
Remove the screws and nuts (Fig. 19) bolts placed in the ends of the axis of rotation.
Lift up the fork and remove the single tank. Do not turn the fork around.
The new single tank has to be installed in the same position as the old one.
Replace the locking nuts with new nuts enclosed with the new single tank.
Install the four screws according to (Fig. 19).
Siemens-Elema AB
Solna, Sweden
!
Fig. 19
SPR8-215.898.01
Rev. 05
01.02
Page 15 of 28
MOBILETT Plus / - E/ - M
SPS-UD
10 - 15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mobilett plus eMobilett plus m30401081020001

Table of Contents