H3C S5800-EI Series Installation Manual page 16

Hide thumbs Also See for S5800-EI Series:
Table of Contents

Advertisement

Mount the switch chassis in the rack:
4.
a. Attach cage nuts (user-supplied) to the mounting holes in the front rack posts. Make sure
the corresponding cage nuts on the front and rear rack posts are at the same height.
b. One person supports the chassis bottom with one hand, holds the front part of the chassis
with the other hand, and pushes the chassis into the rack gently.
Make sure the shoulder screws closely contact with the upper edges of the rear mounting
brackets, as shown in
c. The other person uses the M6 screws (user-supplied) to attach the front mounting brackets
to the front rack posts. Make sure the switch is installed securely in the rack.
Figure 8 Mounting the switch in the rack (with the wide flange of the rear mounting
brackets inside the rack)
Figure 9 Mounting the switch in the rack (with the wide flange of the rear mounting
brackets outside the rack)
Figure 8
and
Figure
9.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5800-32c-eiS5800-56c-eiS5800-56c-ei-m

Table of Contents