Jøtul PC 900 Installation, Operation And Maintenance Manual page 10

Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
5) Unfasten the four screws fastening the rails on the
bottom wall of the insert (fig. 6.1.5).
6) Lift the insert and remove it from the rails of the
load-bearing structure (fig. 6.1.6);
7) Unfasten the pallet fastening screws from the base
and remove the pallet (fig. 6.1.7).
8) Place the load-bearing structure of the insert at the
designated point of installation (1), mark and drill
4 Ø 6 holes for fastening (2) - use the base of the
structure as a template - then drill using a dia. 6 mm
drill bit (fig. 6.1.8)
9) Insert 6 mm pegs into the holes that were made and
fasten the load-bearing structure with screws. (3) -
(fig. 6.1.9).
1
10
2
Ø 6mm x 6
1
fig� 6�1�8
3
Ø 6mm x 6
fig� 6�1�5
fig� 6�1�6
fig� 6�1�7
fig� 6�1�9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pi 900

Table of Contents