Installing the Cephalostat Unit
5–8
INSTALLING THE CEPHALOSTAT
Wiring the Cephalostat Head
9. Pull the cables out of the elbow tube (A). Remove the adhesive tape. Connect the
following wiring in the following order:
Cable ...
(B)
967/Alim Lambda/CN1
(C)
Green and yellow cable
(D)
Ethernet Pano (with ferrite)
(E)
Ethernet Workstation (with ferrite)
(F)
A14/CJ802/J5 (with ferrite)
B
C
D
On the ...
Power supply board
Next to power supply box Ground screw
Control box
Control box
Control box
F
E
To ...
CN1
Pano
Workstation
Synchro
A
2.5 mm