Setting Up Your System; Preinstallation Requirements - Acer Altos G500 User Manual

Hide thumbs Also See for Altos G500:
Table of Contents

Advertisement

Setting up your system

Preinstallation requirements

Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
Near a grounded power outlet
Clean and dust-free
Sturdy surface free from vibration
Well-ventilated and away from sources of heat
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
Acer Altos G500 ystem
Acer Altos G500 User's guide (with system binder)
CD-ROM driver kits
System keys (hung inside the front panel door)
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
21

Advertisement

Table of Contents
loading

Table of Contents