Setting Up The System; Pre-Installation Requirements - Acer ALTOS R910 Series User Manual

Hide thumbs Also See for ALTOS R910 Series:
Table of Contents

Advertisement

Setting up the system

Pre-installation requirements

Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
Near a grounded power outlet
Clean and dust-free
Stable surface free from vibration
Well-ventilated and away from sources of heat
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
Acer Altos R910 system
Acer EasyBUILD
Acer Altos R910 accessory box
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
TM
25

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents