4.3 SLEEVE AND FRONT NOZZLE
Assemble the sleeve and the appropriate front nozzle to the previously
connected body. For proper sleeve assembly on debris exclusion Tube
Spinning Nozzles, ensure that the debris exclusion step feature faces the
inlet end of body. Assemble front nozzle according to appropriate con-
nection rating below.
4.4 15K PSI MODELS
1. Slide sleeve over male end of body.
FOR NPT CONNECTIONS:
2. Apply 3-4 wraps of Teflon thread sealant tape to the available male
threads found on the body.
3. Apply anti-seize compound over the sealant tape for additional
protection against galling.
4. Install appropriate FP front nozzle using smooth jaw plier wrench
(PN 64119).
5. Tighten 1-2 turns past hand-tight. All NPT pipe connections should
have a minimum thread engagement of (4) threads.
FOR BSPP AND M7 FLAT SEAL CONNECTIONS
2. Seat copper crush washer in female BSPP or M7 connection on
appropriate FB or FM cap nozzle.
3. Apply anti-seize compound to male threads of tube spinning
nozzle body.
4. Install the cap nozzle by using appropriate open-end wrench on
flats found on cap nozzle and tighten to 20 lb-ft.
4.5 22K PSI MODELS
1. Slide sleeve over male end of body.
2. Apply anti-seize compound to the available male threads found on
the body.
NOTE: DO NOT use Teflon tape on 22K PSI connections.
3. Install appropriate HPFR/HPFL/HPER/HPEL front nozzle by using
appropriate open-end wrench on flats found on cap nozzle and
tighten until firmly snug.
NOTE: DO NOT OVERTIGHTEN; damage to coned sealing surface
could result.
NOTE: There should be approximately 1/16" to 1/8" clearance between the sleeve and
the front nozzle. With a knife or other sharp object, clear any Teflon tape or exposed
compound between the nozzle and sleeve. Confirm that sleeve spins freely.
May 2017
PI-123
17
Need help?
Do you have a question about the PI-123 and is the answer not in the manual?
Questions and answers