Step 16
Y29
1
Install the second ridge cap over-
lapping the first ridge cap while in-
stalling the remaining roof panels.
Continue weather stripping the ridge.
2
Fasten the lower end of the panels
to the side wall angles using screws
and washers. Use bolts and nuts
through wall angle overlaps at the
bottom of the panel.
3
Attach the right and left side roof
trim to the lower end of the roof pan-
els on each side of the building using
screws at each panel overlap.
NOTE
A single screw fastens both trim
pieces at the overlap.
4
Using your thumb and index fin-
ger, overbend the bottom flange of
the side roof trim at the corner inward
enough so the right and left roof trim
caps fit onto right and left corners.
5
Fasten the roof trim caps to the
side trim using a screw.
6
Fasten the roof panel rib, peak
cap and ridge cap together using
bolts and nuts. Fasten the remaining
peak cap in the same manner.
● Parts Needed For ●
Panels/Ridge Cap/Trim
Cut Weather Stripping
Tape and Fold Under
STEP
3
Roof Trim
8836
Peak Cap
● ● ● ● ● 8486 Ridge Cap (1)
● ● ● ● ● 7483 Roof Panel (2)
● ● ● ● ● 8486 Ridge Cap (1)
● ● ● ● ● 8485 Left Side Roof Trim (2)
● ● ● ● ● 8836 Right Side Roof Trim (2)
STEP
8486
8485
STEP
6
Roof Trim Cap
STEP
STEP
4
5
1
STEP
2
8836
8485
Tuck Flange
Inward to Fit
Inside of
Roof Trim Cap
7483
29