Download Print this page

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
E1
Model No. ES109
704710106
BUILDING DIMENSIONS
*Approx.
Foundation
Size
Size
10' x 9'
121" x 105"
3,0m x 2,6m 307cm x 267cm
* Size rounded off to the nearest foot
Storage Area
Sq. Ft. Cu. Ft.
84
620
123 1/4" 107 1/2"
7,8m
2
17,6m
3
313cm
697.68621
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
Height
97 3/4"
273cm
248cm
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
( Wall to Wall)
Width
Depth
118 1/4" 102 1/4" 96 1/2"
300cm
260cm
245cm
Door
Opening
Height Width Height
69"
68 1/4"
175cm 173cm

Advertisement

loading
Need help?

Need help?

Do you have a question about the ES109 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Arrow ES109

  • Page 1 Owner's Manual & Assembly Instructions Model No. ES109 697.68621 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ 704710106 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION.
  • Page 2 A foundation is also necessary as a base in order to construct a square and level building. Anchoring and foundation materials are not included with your building. We recommend the combined use of an Arrow Floor Foundation Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct the foundation and anchoring system of your choice.
  • Page 3 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation.
  • Page 6 ATTIC KIT / WORKBENCH KIT FLOOR FOUNDATION KITS Heavy-duty galvanized steel bars that fit all 10' wide Arrow buildings. They install quickly and easily to help organize space and create more useable space as an attic or workbench.
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 OPTION 1: ARROW FLOOR FOUNDATION KIT: (Order No. FB109-A or 68385-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This foundation should be used with one of the following: A.
  • Page 10 It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia.
  • Page 11: Table Of Contents

    (Packed with Screws) 66444 66446 6228 Roof Trim Cap Peak Cap (2) 66646 Track Support (4) (2 right & 2 left) (Arrow Logo) Washer (560) 66242 66045 66382 66447 Door Slide (10) Handle (2) Lower Door Guide (8) Facia Cap (4)
  • Page 12: Door

    Parts List Parts In Carton One Assembly Part Part Quantity Check Key No. Number Description In Carton List 0546 Large Right Gable 0547 Large Left Gable 9024 Front Rear Wall Panel 9025 Rear Wall Panel 9026 Rear Wall Panel 9028 Right Outer Gable 9029 Left Outer Gable...
  • Page 13 Assembly by Key No. KEY NUMBERS 28, 29, 35 & 41 ARE SHOWN ON STEP 16...
  • Page 14 0545 Mid Roof Beam Bracket (4) Parts Needed For Step 1 0546 Large Right Gable (2) Large Gable Assembly 0547 Large Left Gable (2) The gables go on top of the front and rear walls to support the roof beams. NOTE The gables are packed nested together and might be mistaken...
  • Page 15 You FRONT 1/4" BOLT 8947 will anchor the building after it is 3/8" BOLT erected. If Arrow Foundation is being 9046 used, disregard note above and follow Foundation Kit instructions. When Diagonal Measurements are Equal the Floor Frame is Square...
  • Page 16 Parts Needed For Step 3 9024 Front/Rear Wall Panel (4) 9023 Corner Panel (4) Corners NOTE Narrow The remainder of the building assembly Side requires many hours and more than one 9023 person. Do not continue beyond this point Wide Side if you do not have enough time to com- plete the assembly today.
  • Page 17 Parts Needed For 9041 Side Eave Channel (2) Step 4 9045 Rear Wall Channel (1) Frames The main frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup- port the roof. Temporarily fasten the rear wall channel across the top of the rear wall using bolts and nuts.
  • Page 18: Acorn

    Parts Needed For 9033 Door Jamb (2) Step 5 9037 Door Track (1) Door Jamb/Track The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both door jambs. The door track supports the sliding doors and reinforces the front wall.
  • Page 19 9042 Angle Brace (4) 9028 Right Outer Gable (2) Parts Needed For Step 6 9029 Left Outer Gable (2) Outer Gable Assembly 9026 Rear Wall Panel (2) 9043 Rear Wall Angle (1) The gables go on top of the front and rear walls to support the roof.
  • Page 20 Parts Needed For Step 7 9027 Main Wall Panel (4) Wall Assembly 9025 Rear Wall Panel (2) The wall panels come in two lengths. Each wall panel Install rear wall panels to angle, channel and frame has a crimped rib on one side. The crimped rib should using bolts and screws.
  • Page 21: Weather

    Gable Assembly (4) Parts Needed For Step 8 0246 Roof Beam Bracket (4) Gables/Brackets/Braces 0248 Gable Brace (2) Lift and fasten a large right gable to the door track using screws. STEP Hint: On the front gable, leave out 2 screws closest to center of gable.
  • Page 22 Parts Needed For 9144 Main Roof Beam (2) Step 9 9143 Outer Roof Beam (4) Roof Beam/Brace Assembly 9154 Roof Beam Brace (5) Attach main roof beams, back to back, at the 4 middle holes with bolts and nuts. Spread the two halves of the main roof beams and fasten to the STEP gable brace of the front gable as...
  • Page 23 Parts Needed For Step 10 9020 Right Roof Panel (1) Right Roof Panel Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer.
  • Page 24 Parts Needed For Step 11 9021 Left Roof Panel (1) 9022 Main Roof Panel (2) Roof Assembly Install a left roof panel at the left rear corner of the roof. Install remaining main roof pan- els and right and left roof panel in the sequence and positions shown on previous page.
  • Page 25 9022 Main Roof Panel (2) Parts Needed For Step 12 9021 Left Roof Panel (1) Roof Assembly 9020 Right Roof Panel (1) NOTE STEP If roof beam holes do not line up with the roof panel holes, shift the building from left to right. If this does not help, your building Weather Stripping Tape may not be level.
  • Page 26 Parts Needed For 5223 Ridge Cap (1) Step 13 9036 Hip Trim (2) Ridge Cap/Hip Trim Install the ridge cap on the com- pleted roof section using bolts. Do not fasten the ends of the ridge cap until instructed to do so later. Fasten the lower end of the panels to the side eave channel using screws and washers.
  • Page 27: Side Roof Trim

    Parts Needed For 5219 Side Roof Trim (2) Step 14 Side Roof Trim Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. Do not fasten the ends of the side roof trim until the next step.
  • Page 28: Facia

    Parts Needed For Step 15 9035 Left Roof Trim (2) 9034 Right Roof Trim (2) Roof Trim & Caps Position left and right roof trim to the ends of roof, noting that trim slips under ridge cap and hip trim, but fits on top of side roof trim.
  • Page 29 9038 Horizontal Attic Channel (4) Parts Needed For 9039 Horizontal Attic Channel (1) Step 16 9048 Vertical Attic Channel (1) Attic Assembly 9040 Vertical Attic Channel (2) Bend tab at one end of vertical attic channel (long) inward. Insert opposite end between main roof beams, align holes and attach with bolts and nuts.
  • Page 30: Lower Door

    9031 Left Door (2) Parts Needed For 9030 Right Door (2) Step 17 9032 Horizontal Door Brace (6) Door Assembly 0403 Secondary Door Track (2) STEP STEP Door Track 9037 Position door slides onto the legs, from the end of door track, as shown in the end view.
  • Page 31 Step 17 Continued Door Installation & Adjustment Put the bottom of left door (with top JAMB DOOR TRACK brace) into the second channel of the LEFT DOOR DOOR TRACK SECONDARY front floor frame. Position the top of LEFT DOOR the door so that the holes in the door line up with the holes in the door slides and fasten as before.
  • Page 32 ES109 697.68621 SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.