Advertisement

Quick Links

Owner's Manual & Assembly Instructions
A01
Model No. EN108-A
709290410
Storage Area: 74 Sq. Ft.
6,9 m
BUILDING DIMENSIONS * Size rounded off to the nearest foot
*Approx.
Base
Size
Size
10' x 8'
121" x 92 3/4"
3,0 m x 2,3 m 307,3 cm x 235,6 cm
NP108
SA108-A
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085
Do not return to dealer, they are not
equipped to handle your requests.
401 Cu. Ft.
11,4 m
2
3
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
123 1/4"
95 1/4"
313,1 cm
241,9 cm
HM108-A
NW108-A
VN108-A
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
(Wall to Wall)
Height
Width
70 7/8"
118 1/4"
180,0 cm
300,4 cm
MN108-A
PD108-A
697.68538-A
Depth
Height
Width
90"
69 5/8"
55 1/2"
228,6 cm
176,8 cm
141,0 cm
Door
Opening
Height
58"
147,3 cm

Advertisement

Table of Contents
loading

Summary of Contents for Arrow EN108-A

  • Page 1 Owner's Manual & Assembly Instructions Model No. EN108-A HM108-A MN108-A NP108 NW108-A PD108-A SA108-A VN108-A 697.68538-A Missing Parts, Questions on Assembly? Call: 1-800-851-1085 Do not return to dealer, they are not equipped to handle your requests. 709290410 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES Storage Area: 74 Sq.
  • Page 2 We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct a base and anchoring system of your choice.
  • Page 3: Tools And Materials

    PLAN AHEAD..Be sure the day you select to install your building is dry and calm. Watch the Weather: Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Whenever possible, two or more people should work together to assemble Teamwork: your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 Roof: amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation. Always keep the door tracks clear of dirt and other debris that prevent them from Doors: sliding easily.
  • Page 6 10'x9' (3,0 m x 2,6 m), use 2 kits. Model No. AT101 Heavy-duty galvanized steel bars that Model No. AK100 fit all 10' (3,0 m) wide Arrow buildings. New concrete anchor system permits They install quickly and easily to anchoring any size Arrow building help organize space and create directly to a concrete slab.
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
  • Page 10 Below are recommended ways of anchoring. (Model No. AK4 or 60298) Anchoring into Wood/Post: Arrow Anchoring Kit: Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base. dia. holes provided in the frames for proper anchoring.
  • Page 11 65109 67468 66646 66045 #8-32 Acorn Nut (4) Peak Cap (2) Washer (369) Handle (2) (Packed with Screws) (Arrow Logo) (10 sheets of 40) 66183 66382 Roof Trim Cap 66769 6228 Lower Door Guide (4) (2 right & 2 left)
  • Page 12: Parts List

    Parts List Assembly Part Part Quantity Check Key No. Number Description in Carton List 3719 Door Handle Brace 9364 Wall Panel (Side) 9372 Front Wall Panel 9365 Front Wall Channel 5986 Rear Wall Angle 6000 Right Gable 6001 Left Gable 10497 Horizontal Door Brace 9355...
  • Page 13 Assembly by Key No.
  • Page 14 ● ● ● ● ● 8934 Ramp (1) ● Parts Needed For ● ● ● ● ● ● 9367 Front Floor Frame (2) Step 1 ● ● ● ● ● 8936 Rear Floor Frame (2) Floor Frame Assemblies ● ● ● ● ● 8937 Side Floor Frame (4) The front floor frame is made up of three pieces.
  • Page 15: Frame Assemblies

    ● ● ● ● ● 5986 Rear Wall Angle (2) ● Parts Needed For ● ● ● ● ● ● 9917 Rear Wall Channel (2) Step 2 ● ● ● ● ● 9922 Side Wall Channel (4) Frame Assemblies ● ● ● ● ● 8839 Side Wall Angle (4) The main frame pieces reinforce the walls.
  • Page 16 ● Parts Needed For ● ● ● ● ● ● 10470 Roof Beam (8) Step 3 Roof Beam Assemblies The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces 10470 overlapped back to back at the cen- ter.
  • Page 17: End View

    ● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) Step 4 ● ● ● ● ● 9366 Door Track (2) Door Track Assembly NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall.
  • Page 18 ● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● Step 5 ● ● ● ● ● Side Floor Assembly (2) Floor Frame ● ● ● ● ● Rear Floor Assembly (1) RIGHT REAR 8937 Assemble the four corners of the floor frame using two screws at each STEP corner as shown.
  • Page 19: Top View

    ● Parts Needed For ● ● ● ● ● ● 8995 Wall Panel (2) Step 6 ● ● ● ● ● 9372 Front Wall Panel (2) Corners ● ● ● ● ● 9362 Corner Panel (4) NOTE Narrow The remainder of the building assembly Side 9362 requires many hours and more than one...
  • Page 20 ● ● ● ● ● Door Track Assembly (1) ● ● ● ● ● Rear Wall Angle Assembly (1) ● Parts Needed For ● Step 7 ● ● ● ● ● Side Wall Angle Assemblies (2) Frames ● ● ● ● ● Rear Wall Channel Assembly (1) ●...
  • Page 21 ● Parts Needed For ● ● ● ● ● ● 9364 Wall Panel (4) Step 8 ● ● ● ● ● 8995 Wall Panel (4) Wall Panels The wall panels come in two widths. STEP Each wall panel has a crimped rib on 8995 8995 one side.
  • Page 22 ● Parts Needed For ● ● ● ● ● ● 9900 Door Jamb (2) Step 9 ● ● ● ● ● 9365 Front Wall Channel (2) Front Channel/Door Jamb The door jambs reinforce the door opening and provide an attractive 9365 trim.
  • Page 23 ● Parts Needed For ● ● ● ● ● ● 6000 Right Gable (2) Step 10 ● ● ● ● ● 6001 Left Gable (2) Gable Assemblies ● ● ● ● ● 5971 Roof Beam Bracket (4) The gables go on top of the front and rear walls to support the roof beams.
  • Page 24 ● ● ● ● ● Left Gable Assemblies (2) ● Parts Needed For ● Step 11 ● ● ● ● ● Right Gable Assemblies (2) Gables/Braces ● ● ● ● ● 6635 Gable Brace (2) Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws.
  • Page 25 ● Parts Needed For ● ● ● ● ● ● Main Roof Beam (1) Step 12 ● ● ● ● ● Single Roof Beam (2) Roof Beams Spread the two halves of the main STEP roof beam and fasten the roof beam to the gable brace of the front gable.
  • Page 26 ● Parts Needed For ● Step 13 ● ● ● ● ● 8468 Right Roof Panel (1) Right Roof Panel STEP Installing the roof panels is best done with a step ladder. Begin installing 8468 8469 roof panels at the back right corner of the building.
  • Page 27: Roof Assembly

    ● ● ● ● ● 8468 Right Roof Panel (1) ● Parts Needed For ● ● ● ● ● ● 8469 Left Roof Panel (2) Step 14 ● ● ● ● ● 7483 Roof Panel (2) Roof Assembly ● ● ● ● ● 6529 Roof Panel (2) STEP Install a left roof panel at the left STEP...
  • Page 28 ● ● ● ● ● 8840 Ridge Cap (1) ● Parts Needed For ● Step 15 ● ● ● ● ● 7483 Roof Panel (2) Ridge Caps & Panels ● ● ● ● ● 8486 Ridge Cap (1) Install the first ridge cap on the completed roof section using bolts and nuts.
  • Page 29 ● Parts Needed For ● ● ● ● ● ● 8485 Left Side Roof Trim (2) Step 16 ● ● ● ● ● 8836 Right Side Roof Trim (2) Roof Trim Attach the right and left side roof trim to the lower end of the roof pan- els on each side of the building using screws at each panel overlap.
  • Page 30: Door Assembly

    ● ● ● ● ● 3719 Door Handle Brace (2) ● Parts Needed For ● Step 17 ● ● ● ● ● 10489 Right and Left Doors (2) ● ● ● ● ● 10497 Horizontal Door Brace (4) Door Assembly ●...
  • Page 31 ● Parts Needed For ● ● ● ● ● ● Right Door Assembly (1) Step 18 ● ● ● ● ● Left Door Assembly (1) Door Installation & Adjustment Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the...
  • Page 32 Anchoring and Floor Frame UO32 Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time.
  • Page 33 SOME FACTS ABOUT RUST XA35hw SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.

Table of Contents