Arrow Storage Products AR1012 C1 Owner's Manual & Assembly Manual page 35

Hide thumbs Also See for AR1012 C1:
Table of Contents

Advertisement

Step 13: Continued
You will need for this page:
(QTY: 16)
Continue to apply weather stripping.
6
Attach two (2) Roof Panels using the
diagram to the right while assembling the
roof.
Attach Long Ridge Cap with two (2) bolts
7
and nuts. DO NOT secure end of Ridge
Caps until Peak Caps are in place.
Do not fasten the holes on the lower end
8
of the Panels. Double check that Panels
are installed in the correct position. The
part numbers listed in the Roof Panel Placement
diagram on page 33 must match the numbers
inked on the Panels.
DO NOT fully tighten Ridge Cap bolts until you
have both Ridge Cap bolts in place. This will ease
assembly. Bolts must be fully tightened before moving on
to the next page.
(QTY: 4)
2
7743
6869
Roof Panel
Ridge Cap
FASTEN TO NEXT PANEL WITH BOLT AND NUT
6869
7743
35
1
FASTEN TO RIDGE CAP (NEXT TWO PAGES)
FASTEN TO ROOF BEAMS WITH SCREWS
DO NOT FASTEN AT THIS TIME
DO NOT secure end of
Ridge Caps until Peak
Caps are in place.
7743
35BJ

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ar1012fb c1Ar1012h4 c1Lw1012 a1Lw1012

Table of Contents