Download Print this page
Arrow Storage Products VVCS85 Owner's Manual & Assembly Instructions

Arrow Storage Products VVCS85 Owner's Manual & Assembly Instructions

8' x 5' normal size
Hide thumbs Also See for VVCS85:

Advertisement

Quick Links

719780416
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!
Customer Service:
1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Size
8' x 5'
36 Sq. Ft. 241 Cu. Ft.
2,4 m x 1,4 m
3,3 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
Storage
(Roof Edge to Roof Edge)
Area
Width
99 3/4"
2
6,8 m 3
253,4 cm
Depth
Height
Width
59 1/2"
91 3/8"
94 3/4"
151,1 cm
232,1 cm
240,7 cm
www.arrowsheds.com
Model No.
8' x 5'
Base
97 1/2" x 57"
Size
247,7 cm x 144,8 cm
For proper base construction see page 12
Interior Dimensions
(Wall to Wall)
Depth
Height
54 1/4"
90 1/16"
137,8 cm
228,8 cm
01AM
VVCS85
Nominal Size
Door
Opening
Width
Height
59 1/2"
69 1/4"
151,1 cm
175,9 cm

Advertisement

loading

Summary of Contents for Arrow Storage Products VVCS85

  • Page 1 01AM 719780416 Owner’s Manual & Assembly Guide www.arrowsheds.com Gloves must be worn at all times to reduce risk of injury! Model No. VVCS85 8’ x 5’ Nominal Size Customer Service: 1-800-851-1085 Base 97 1/2” x 57” assist@arrowsheds.com Size 247,7 cm x 144,8 cm...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3: What You Need

    ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4: Frequently Asked Questions

    FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6: Customer Service

    What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... Hardware Views by Key No. Part Part Qty. Description List 65103 Hex Nut (#8-32) 65923-61 Small Bolt (Stone) (#8-32 x 3/8) (10 mm) #2 Phillips #2 Phillips 11/32 Hex. 65923-62 Small Bolt (Vanilla) (#8-32 x 3/8) (10 mm) 65923-06 Small Bolt (Black) (#8-32 x 3/8) (10 mm) 65004-61 Small Screw (Stone) (#8AB x 5/16) (8 mm) 65004-62 Small Screw (Vanilla) (#8AB x 5/16) (8 mm)
  • Page 8 PARTS LIST... 08AM Part Part Qty. Selected End Views by Key No. Description List 9377 Front/Rear Floor Frame 9402 Side Floor Frame 10702 Ramp 5284 Right Corner Post 5285 Left Corner Post 5287 Rear Splice Post 10780 Right Door Jamb 80069 Left Door Jamb 10827 Door Jamb Angle 10 9344...
  • Page 9 ASSEMBLY BY KEY NO. 09AM NOTE: Double Wall Studs are used on side and back walls to support Siding Panels. Walls Floor...
  • Page 10 ASSEMBLY BY KEY NO. 10AM Roof Doors...
  • Page 11: Assembly Overview

    ASSEMBLY OVERVIEW 11AM Erect Post, Studs, and Door Jambs Build the Floor Frame Install Siding Panels Attach Gables and Roof Beams Install Roof Panel, Ridge Cap, Install Doors Side Trim, Corner Cap Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frame Pre-Assembly You will need for this page: Washers are to be 9377 used painted parts only. Washers are not necessary on unpainted Front/Rear parts and there are not enough Floor Frame (QTY: 8) to use on every Screw and Bolt. Join two (2) Front/Rear Floor Frames together by overlapping them as shown and secure the Frames with four (4) Stone Bolts and Nuts.
  • Page 14 Step 2: Frame Pre-Assembly You will need for this page: 9337 9336 10826 10795 Left Rear Right Rear Front Inner Front Outer (QTY:2) Wall Angle Wall Angle (QTY: 1) Header Header Connect the Front Inner Header to a Front Outer Header using one (1) Stone Screw as shown.
  • Page 15 Step 3: Stud Assembly You will need for this page: 9344 (QTY:60) Siding Stud Join two (2) Siding Studs together using six (6) Stone Screws as shown. BUILD TEN (10) ASSEMBLIES 9344 9344 Top view of Siding Studs. 35 9/16” (90,3 cm) Repeat process to make nine (9) more assemblies.
  • Page 16 Step 4: Roof Beam Assembly You will need for this page: 10825 Roof Beam (QTY: 12) Place two (2) Roof Beams back-to-back with small holes on top. Fasten together using four (4) Stone Bolts and Nuts. DO NOT FULLY TIGHTEN. BUILD THREE (3) ASSEMBLIES End view of Roof Beam 10825...
  • Page 17 Step 5: Door Pre-Assembly You will need for this page: 10782 10718 10719 10720 67236 Horizontal Door Handle Diagonal Door Adhesive Pad Door Panel (QTY: 2) Door Brace Brace Brace (QTY: 24) Start assembly by sliding the Door Handle Place the ends of Diagonal Door Braces with Brace into the middle of the Door and securing small holes under Horizontal Door Braces it with four (4) Stone Screws.
  • Page 18 Step 6: Right Door Assembly You will need for this page: 66609 66809 66054 66811 Handle Locking (QTY: 2) (QTY: 6) (QTY: 6) Hinge Handle Right Latch Backplate 66812 Hinge Plate Decor Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle and Handle Backplate...
  • Page 19 Step 7: Left Door Assembly You will need for this page: 66609 66810 66811 66812 Handle Hinge Plate Left (QTY: 2) (QTY: 6) Hinge Backplate Decor Handle (QTY: 6) Attach Hinges to Door using six (6) Flat Head Bolts. Locking Handle Install Handle Backplate using two (2)
  • Page 20 Step 7: Continued You will need for this page: 66808 10721 66684 Bottom Top Latch Door Stop (QTY: 8) Latch Spring Spring Remove two (2) Screws from left side of Door Handle Brace and far left Screw from both top and bottom Horizontal Door Brace.
  • Page 21 Step 8: Floor Assembly You will need for this page: Assemblies from Step 1: 9402 • Floor Frame Assemblies (2) Side Floor (QTY: 8) Frame The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today.
  • Page 22 Step 9: Posts/Frame You will need for this page: Assemblies from step 2: 5284 5285 9912 • Header Assembly (1) • Rear Wall Angle Right Corner Left Corner Side Wall Post Post Angle Assembly (1) (QTY: 22) Position Right and Left Corner Posts at the corner of the Floor Frame as shown.
  • Page 23 Step 10: Splice Post/Door Jamb You will need for this page: 10780 80069 5287 Rear Splice Right Door Left Door (QTY: 4) (QTY: 6) Post Jamb Jamb (QTY: 4) Position Splice Post at the center of the rear wall and fasten using two (2) Stone Screws into rear Floor Frame and four (4) Stone Bolts and Nuts into Rear Wall Angle Assembly.
  • Page 24 Step 11: Studs You will need for this page: Assemblies from step 3: • Stud Assemblies (10) (QTY: 10) Following dimensions, measuring from the end of angle, position a Stud Assembly inside top angle and fasten with one (1) Stone Screw through the lower hole of angle. Place bottom of Stud Assembly over Floor Frame as shown.
  • Page 25: Step 12: Side Siding

    Step 12: Side Siding You will need for this page: Washers are to be used on painted 10787 parts only. Washers are not necessary on unpainted parts and there are not enough to use on every Screw and Bolt. Side Siding (QTY: 30) (QTY: 24) Slide bottom Side Siding into channels of Corner Posts as shown.
  • Page 26 Step 13: Rear Siding You will need for this page: 10792 Rear Siding (QTY: 24) (QTY: 28) Slide bottom Rear Siding Panels into channels of Corner Posts and Splice Post as shown. Once in place, secure with four (4) Vanilla Screws per Panel. Screws going into bottom Floor Frame also secure Stud Assemblies.
  • Page 27 Step 14: Front Siding You will need for this page: 10794 Front Siding (QTY: 24) Slide Front Siding into channels of Corner Posts and Door Jambs as shown. Once in place, secure Panels from inside the building to the Corner Posts and Door Jambs using four (4) Stone Screws per Panel.
  • Page 28 Step 15: Gables You will need for this page: 8700 8701 7905 Roof Beam Right Gable Left Gable Bracket (QTY: 8) GABLES STACKED TOGETHER DURING SHIPPING MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Attach a Roof Beam Bracket to all four (4) Gables using two (2) Vanilla Bolts and Nuts for each.
  • Page 29 Step 15: Continued You will need for this page: 67293 Weather (QTY: 32) Stripping Working one (1) Gable at a time, lift Left and Right Gables into place on top of Rear Wall Angle and Front Header. Gables must go under Side Wall Angles. Secure using seven (7) Stone Screws per Gable.
  • Page 30 Step 16: Roof Beams/Braces You will need for this page: 9204 Assemblies from step 4: • Roof Beam Assemblies (3) Roof Beam (QTY: 14) Brace (QTY: 2) Side of Beams with small Secure the Roof Beam Assemblies holes must face up. to the Gables as shown using two (2) Stone Bolts and Nuts on each end of each Roof Beam Assembly.
  • Page 31: Step 17: Roof Assembly

    Step 17: Roof Assembly 31AM You will need for this page: 80073 10788 67293 Right Roof Weather Left Roof (QTY: 68) (QTY: 2) Stripping Panel Panel Don’t focus weight Attach Front Left and Right Roof Panels, one at a on roof! time, to Roof Beams and Gables using seventeen (17) Stone Screws per panel.
  • Page 32 Step 18: 32AM Ridge Cap/Roof Trim You will need for this page: 6869 6015 66183 66183 67468 Left Corner Right Corner Side Roof (QTY: 2) (QTY: 4) Ridge Cap Trim Peak Cap Don’t focus weight (QTY: 6) on roof! Fully tighten Bolts and Nuts on Roof Beams. Install Peak Caps and Ridge Cap using six (6) Stone Bolts and Nuts as shown.
  • Page 33 Step 19: Door Installment 33AM You will need for this page: Assemblies from step 5: 10702 10827 • Right Door Assembly (1) Door Jamb • Left Door Assembly (1) (QTY:4) (QTY:12) Ramp Angle NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! (QTY: 2) Put one (1) Stone Bolt through empty hole in middle of each Door Jamb.
  • Page 34 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 35 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
  • Page 36: How To Order

    ARROW ACCESSORIES... ANCHOR KITS FLOOR FRAME KITS Model No. AK4 MODELS FB47410, FB5465, Anchor Kit contains heavy-duty steel FB106-A, FB109-A, FB1014-A, augers, 60' (18 m) of steel cable and and FBSDS108 4 cable clamps. No digging or concrete pouring, just insert cable under roof, A simple fl...