Summary of Contents for Arrow Storage Products 697
Page 1
*Approx. Foundation Storage Area Size Size Sq, Ft. Cu, Ft, 10'x10' 121"x1141/2" 3.0mx28m 307cmx291cm 8,5m 2 & Assembly Instructions KM1010 697.68101D Exterior Dimensions (Roof Edge to Roof Edge) Width Depth 1231/4" 117" 14.1m _ 313cm 297cm SC1010D CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING TO AVOID A MISHAP.
Page 2
BEFORE Owner's Manual Before beginning construction, and other requirements. Important information and helpful enjoyable. Assembly Instructions: appropriate information and during assembly, follow the step sequence Foundation andAnchoring: damage. A foundation is also necessary as a base in order to construct a square and level building.
Watch the Weather: Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
Page 4
Safety precautions are important ,Care must be taken when handling pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance ing. sM_ty edge sharpedge satiety edge ,Keep children and pets away from worksite to avoid distractions and any accidents...
Page 5
CARE A5 Web Finish: For long lasting finish, periodically up scratches as soon as you notice them on your unit. Immediately a wire brush; wash it and apply touch-up Roof: Keep roof clear of leaves and snow with long handled, soft-bristled amounts of snow on roof can damage building making it unsafe to enter.
Page 6
A6 V_ EB ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designedforaddedprotectionagainst hea W snow accumulation. Increases the strength of your roof by 50% ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18m) of steel cable and 4 cable clamps.
Page 9
The Foundation For Your Building OPTION 1: ARROW FLOOR Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of f.
Page 10
_\ll) it is important that the entire floor frame be anchored Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. Arrow Anchoring Kit: (Model No.
Page 11
Remove from bag of screws and save for the last step 65103 #10Bxl/2" #8-32 Hex Nnt (165} 66045 Handle (2) 66769 Door Slide (4) Hardware 65900A Black Screw(8) (Packed with Screws) #8=32×3/8" Bolt (165) 66646 Washer(361 ) #8-32 Acorn Nut (4) (10 sheets of 40) (Packed with Screws) 66382...
Page 14
C_,d.._. _V= I The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount...
Page 15
tpC"e- The main frame pieces reinforce the walls. These pieces will later be in- stalled in the center and at the top edge of the side walls and the rear wall. Proceed as follows: Overlap the rear wall channel pieces as shown in the figure fasten the two pieces together one bolt in the center...
Page 16
Step 3 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped, back to back at the cen- ter. The left and right roof beam as- semblies are made up of two pieces. Hint: These pieces are force-fitted, so you may have to press hard to join them together.
Page 17
Step 4 The door track assembly supports the sliding doors and reinforces front wall. Iris made up of three pieces. Using the door track splice, (painted), join the door (galvanized) pieces end-to-end as shown. 2 Insert four screws from the under- side only.
Page 18
Step 5 "1 Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through the bottom with nuts on top. Measure the floor frame diago- nally. When the diagonal measure- ments are equal, the floor frame is square.
Page 19
Step 6 UNI9 NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to com- plete the assembly today. A partially assembled building can be severely damaged by light winds.
Page 20
The main frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup- port the roof. Fasten the rear wall angle sembly across the inside top of the rear wall using screws. 2 Fasten the rear wall channel sembly across the middle of the rear wall using screws.
Page 21
Step 8 L]N21 Each wall panel has a crimped rib on one side. The crimped rib should go under the rib of the panel that follows 1 Locate all of the wall panels set each one alongside the building. 2 Be surethatyou have the correct panels in each position.
Page 22
Step 9 UN22 The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both doorjambs. 1 Fasten the front wall channels in their positions between the end of the side waft channel and the cor- ner panel using screws.
Page 23
Step 10 The gables go on top of the front and rear walls to support the roof beams. NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing. Attach four roof brackets to the gables using two...
Page 24
Step 11 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws. Hint: On the rear gable, use a bolt and nut at the overlapping rear wall angle. On the front gable, leave out 2 screws closest to center gable leg.
Page 25
"1 Spread the two halves of the main roof beam and fasten the roof beam to the gable brace of the front gable. 2 Fasten the other end of the main roof beam to the gable brace of the rear gable. Fasten the single roof beams, small holes on top, as shown using...
Page 26
Step 13 Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer. NOTE Measure the building diagonally again and make adjustments make sure the building is square.
Page 27
Step 14 1 Install a left roof panel at the left rear corner of the roof. Install 4 roof panels in the se- quence and positions shown. low fastener sequence and instruc- tions in Steps 13 th ru 15 while fasten- ing roof panels.
Page 28
Step 15 "1 Install 1 ridge cap on the com- pleted roof section using bolts and nuts. Fasten the roof panel rib, peak cap and ridge cap together bolts and nuts. 2 Fasten the remaining left and right roof panels as you un roll the weather stripping tape, and press it down,...
Page 29
Step 16 "1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap, 2Using your thumb and index finger, overbend the bottom flange side roof trim and roof panel rib at the corner inward enough...
The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door. Each bolt and screw in the door requires a washer. ceed as follows: 1 Attach the door handle brace and handle to the door with 1 bolt as...
Step 18 "1 From inside the building, put the bottom of the right door assembly your left when you are inside building) behind door jamb into the front frame track. 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
Page 32
4. Touch up scrapes or nicks and any area of visible rust as soon as possible. free of moisture, oils, dirt or grime and then apply an even film of high quality touch-up 697.68101 or scraping the coating surface, supplied.