Download Print this page

Arrow Storage Products BWG54 Owner's Manual & Assembly Instructions

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
BI01
Model No.
709181016
Storage Area: 16 Sq. Ft. 93 Cu. Ft.
1,5 m
2
BUILDING DIMENSIONS * Size rounded o to the nearest foot
*Approx.
Base
Size
Size
5' x 4'
57" x 45 7/8"
1,4 m x 1,1 m 144,8 cm x 116,5 cm 151,1 cm
BW54-A
BWW54
697.68711
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or
assist@arrowsheds.com
Do not return to dealer, they are not
equipped to handle your requests.
2,6 m
3
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
Height
59 1/2"
48"
70 3/4"
121,9 cm
179,7 cm
BWG54
YL54
BW54BQ
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
(Wall to Wall)
Width
Depth
Height
54 1/4"
43 1/8"
69 1/2"
137,8 cm 109,5 cm 176,5 cm
BWGE54
Door
Opening
Width
Height
22 1/4"
65"
56,5 cm 165,1 cm

Advertisement

loading

Summary of Contents for Arrow Storage Products BWG54

  • Page 1 Owner's Manual & Assembly Instructions BI01 Model No. BW54-A BWG54 BWW54 YL54 697.68711 BW54BQ BWGE54 Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. 709181016 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP.
  • Page 3 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 4 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 5 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in pieces of your building since some contain the assembly of this building. Be familiar with sharp edges.
  • Page 6 CARE & MAINTENANCE..Finish: For long lasting nish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 7 ACCESSORIES..FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18 m) of steel cable and...
  • Page 8 ORDERING ACCESSORIES..02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is o ering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2...
  • Page 9 Base BI09 The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an e ective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire oor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base.
  • Page 11: Table Of Contents

    Hardware BI11 Remove from bag of screws and save for the last step 65900A #10Bx1/2" (13 mm) 65923 65004 65103 Black Screw (4) #8-32x3/8" (10 mm) #8Ax5/16" (8 mm) #8-32 Hex Nut (31) (Packed with Screws) Bolt (31) Screw (121) 65109 66098 66646...
  • Page 12 Parts List BI12 Assembly Part Part Quantity Check Key No. Number Description in Carton List 3719 Door Handle Brace 6300 Vertical Door Brace 6627 Wall Panel 6633 Corner Panel 7044 Corner Panel 10500 Horizontal Door Brace 10473 Door 7461 Rear Wall Angle 7464 Right Roof Panel 7465...
  • Page 13 Assembly by Key No. BI13...
  • Page 14: Door Slide

    Step 1 Parts Needed For 9457 Door Track (1) Door Track/Header Assembly 7661 Header (1) BI14 The door track/header assembly suppor ts the sliding door and reinforces the front wall. It is made up of two pieces. Using the door track, with small holes on top, join the header, short leg on top, as shown using screws.
  • Page 15 Step 2 Parts Needed For 9458 Front Floor Frame (1) 8972 Rear Floor Frame (1) Floor Frame 8971 Side Floor Frame (2) BI15 RIGHT REAR 8971 Assemble the four corners of the 8972 oor frame using two screws at each 8971 corner as shown.
  • Page 16 Step 3 Parts Needed For 7044 Corner Wall Panel (2) Corners 6633 Corner Wall Panel (2) BI16 STEP NOTE Narrow The remainder of the building assembly Side REAR requires many hours and more than one person. Do not continue beyond this 7044 7044 point if you do not have enough time to...
  • Page 17 Step 4 Parts Needed For 7461 Rear Wall Angle (1) 9918 Rear Wall Channel (1) Frames 9919 Side Wall Channel (2) BI17 The main frame pieces give rigidity to the side and rear walls and provide a surface for attaching the gables which support the roof.
  • Page 18: Bolt

    9456 Front Wall Panel (1) Step 5 Parts Needed For Door Track Assembly (1) 9698 Door Jamb (1) Panels/Track/Jambs 9370 Door Jamb (1) 6627 Wall Panel (1) BI18 Each wall panel has a crimped rib on one side. The crimped rib should go Plastic Spacer under the rib of the adjacent panel.
  • Page 19 Step 6 Parts Needed For 7532 Right Gable (1) 7533 Left Gable (1) Gables/Roof Beam 7660 Roof Beam (1) BI19 Lift and fasten a right and left gable, overlapping header in front, to the right and left hand wall with screws.
  • Page 20 Step 7 Parts Needed For 7464 Right Roof Panel (1) Roof Assembly 7465 Left Roof Panel (1) BI20 STEP Installing the roof panels is best done with a step ladder. Begin installing roof panels at the right side of the building.
  • Page 21 Step 8 Parts Needed For 7534 Roof Trim (2) Roof Trim BI21 STEP Attach the roof trim to the ends of the roof panels on each side of the Roof Trim Cap building using screws at each panel Roof Trim overlap.
  • Page 22 Step 9 3719 Door Handle Brace (1) Parts Needed For 10473 Door (1) Door Assembly 10500 Horizontal Door Brace (2) BI22 6300 Vertical Door Brace (1) The steps on this page tell how to assemble the door. Each bolt and screw in the door requires a washer.
  • Page 23 Step 10 Parts Needed For Door Assembly (1) 7972 Door Handle Door Installation & Adjustment Lock Bracket (1) BI23 From inside the building, put the bottom of the door assembly (on Header Horizontal Door Brace your right when you are inside the Door Track building) behind door jamb into the front frame track.
  • Page 24 BW54-A BWG54 BWW54 YL54 697.68711 BW54BQ BWGE54 BI24 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST 1.

This manual is also suitable for:

Bww54Bw54-aYl54Bw54bqBwge54