Arrow Storage Products AR1012 C1 Owner's Manual & Assembly Manual page 33

Hide thumbs Also See for AR1012 C1:
Table of Contents

Advertisement

Roof Install Prep Page
Use the information on this page to complete steps 13 thru 14.
If Roof Beam holes do not line up with Roof
Panel holes, shift the building from left to right. If
this does not help, your building may not be level.
Shim the corners until holes line up.
Measure the building diagonally again to make
sure the building is square. The building should
be square at the base and at the top. This will
make roof panels fi t better and holes will better
align.
If a Roof Strengthening Kit was purchased,
assemble and install before attaching Roof
Panels.
Be sure to carefully follow the Roof Panel
Placement Order Diagram on this page.
The building is square when diagonal measurements are equal.
Roof Panel Placement Order
2
9087
4
7743
6
7743
8
7743
10
9086
Crimped Rib
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
1
3
5
7
9
FRONT
33
Uncrimped Rib
9086
7743
7743
7743
9087
33BJ

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ar1012fb c1Ar1012h4 c1Lw1012 a1Lw1012

Table of Contents