Download Print this page

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
ADG01
Model No.
720651015
Storage Area:
115 Sq. Ft.
10,7 m
BUILDING DIMENSIONS * Size rounded off to the nearest foot
*Approx.
Base
Size
Size
10' x 12'
121" x 143 1/4"
3,0 m x 3,6 m 307,3 cm x 363,9 cm
WDA1012
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or
assist@arrowsheds.com
Do not return to dealer, they are not
equipped to handle your requests.
729 Cu. Ft.
20,6 m
2
3
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
123 1/4"
145 3/4"
313,1cm
370,2 cm
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
(Wall to Wall)
Height
Width
90 5/8"
118 1/4"
230,2 cm
300,4 cm
Depth
Height
Width
140 1/2"
89 3/8"
55 1/2"
356,9 cm
227,0 cm
141,0 cm 175,9 cm
Door
Opening
Height
69 1/4"

Advertisement

loading

Summary of Contents for Arrow Storage Products WDA1012

  • Page 1 Owner's Manual & Assembly Instructions ADG01 Model No. WDA1012 Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. 720651015 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES Storage Area: 115 Sq.
  • Page 3 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 4 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 5 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in pieces of your building since some contain the assembly of this building. Be familiar with sharp edges.
  • Page 6 CARE & MAINTENANCE..Finish: For long lasting fi nish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 7 ACCESSORIES..FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18 m) of steel cable and...
  • Page 8 ORDERING ACCESSORIES..02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is offering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2...
  • Page 9 Base ADG09 The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire fl oor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base.
  • Page 11 Hardware ZA08 Remove from bag of screws and save for the last step 65900A 65923 65004 #10Bx1/2" (13 mm) 65103 #8-32x3/8" (10 mm) #8Ax5/16" (8 mm) Black Screw (8) #8-32 Hex Nut (149) Bolt (149) Screw (392) (Packed with Screws) 66646 66045 67468 (Arrow Logo)
  • Page 12: Table Of Contents

    Parts List ZA09 Parts in Carton One Assembly Part Part Quantity Check Key No. Number Description In Carton List 5287 Splice Post 5284 Corner Post, Right 8576 Right Gable 8577 Left Gable 6287 Side Siding 7311 Door Jamb 8736 Rear Siding 8737 Front Siding 10472...
  • Page 13 Assembly by Key No. ZA10 NOTE: Items #34 and #35 can be used in place of item #16 at any location.
  • Page 14: Side Floor Frame

     8934 Ramp (1) Step 1  Parts Needed For   9367 Front Floor Frame (2) Floor Frame Assemblies  8936 Rear Floor Frame (2) XN11  10392 Side Floor Frame (4) (13) 9367 The front fl oor frame is made up of 8934 three pieces.
  • Page 15: Side Wall Angle

    Step 2  Parts Needed For   5986 Rear Wall Angle (2) Frame Assemblies 10394 Side Wall Angle (4) ZA12 The main frame pieces reinforce the walls. These pieces will later be Rear Wall Angle installed at the top edge of the side 118 1/8"...
  • Page 16: Roof Panel

    Step 3  Parts Needed For   10397 Roof Beam (8) Roof Beam Assemblies XN13 (30) 10397 The roof beams join the two gables and support the roof panels. The 10397 main roof beam is made up of four pieces overlapped back to back at the center.
  • Page 17 Step 4  Parts Needed For   6403 Door Track Splice (1) Door Track Assembly  9366 Door Track (2) XD14 NOTE: Door Track Splice (painted part) 6403 The door track assembly supports the sliding doors and reinforces the front wall.
  • Page 18 Step 5  Front Floor Assembly (1)  Parts Needed For   Side Floor Assembly (2) Floor Frame  Rear Floor Assembly (1) XN15 RIGHT REAR 10392 STEP 8936 Assemble the four corners of the fl oor frame using two screws at each corner as shown.
  • Page 19  5284 Right Corner Post (2) Step 6  Parts Needed For   5285 Left Corner Post (2)  Door Track Assembly (1) Posts/Top Frames  Rear Wall Angle Assembly (1) ZA16  Side Wall Angle Assembly (2) (16) REAR NOTE 5284...
  • Page 20: Splice Post

    Step 7  5287 Splice Post (1)  Parts Needed For   5283 Side Splice Post (2) Splice Post/Door Jamb  7311 Door Jamb (2) YB17 STEP ANGLED END OF SPLICE POST MUST The door jambs reinforce the door BE ON TOP opening and provide an attractive 5283...
  • Page 21 Step 8  Parts Needed For   9344 Siding Stud (10) Studs/Front Channel  9365 Front Wall Channel (2) ZA18 Rest bottom tab (large hole) outside fl oor frame. Do not fasten (12) tab at this time. Repeat procedure for the remaining studs around the building.
  • Page 22: Side Siding

    Step 9  Parts Needed For   6287 Side Siding (12) Side Siding ZA19 Add these to 8 screws. Removed and Reused (48) (48) Each screw and bolt in the wall requires a washer. STEP CORRECT INCORRECT Slide side siding into channels of corner and splice posts, fl...
  • Page 23 Step 10  Parts Needed For   8736 Rear Siding (6) Rear/Front Siding  8737 Front Siding (6) YB20 Add these to 2 screws. Removed and Reused (48) (12) STEP STEP Slide rear siding into channel of corner and splice posts fastening Fasten Top Center of to rear frame as shown in previous Last Siding to Stud...
  • Page 24 Step 11  Parts Needed For   8576 Right Gable (2)  8577 Left Gable (2) Gable Assemblies  6635 Roof Beam Bracket (4) YB21 STEP The gables go on top of the front and Edge Trim rear walls to support the roof beams. (plastic piece) NOTE The gables are packed nested...
  • Page 25 Step 12  Parts Needed For   Left Gable Assemblies (2)  Right Gable Assemblies (2) Gables/Braces  9009 Gable Brace (2) YB22 (32) Lift and fasten a right and left gable, under angle at corner, to the rear wall angel with screws.
  • Page 26 Step 13  Main Roof Beam (1)  Parts Needed For   Single Roof Beam (2) Roof Beam/Braces  9204 Roof Beam Brace (2) YB23 (16) Wrap the weather stripping tape around the two joined edges of the left and right gables. See diagram. Spread Two Halves Cut the weather stripping to length.
  • Page 27 Step 14  Parts Needed For   10927 Translucent Panel (2) Skylight Roof Panel Assembly  10553 Partial Roof Panel (2) YB24 Place panels according to the diagram below. Ensure that the ends of the panels with the slotted holes are at the same end with the slot to the outside of the fi...
  • Page 28 Step 15  Parts Needed For   9086 Right Roof Panel (1) Right Roof Panel ZA25 9087 9086 7743 7743 Installing the roof panels is best done with a step ladder. Install the fi rst roof panel at the back right corner of the 7743 7743 building.
  • Page 29 Step 16  Parts Needed For   9087 Left Roof Panel (1)  7743 Roof Panel (2) Roof Assembly  6869 Ridge Cap (1) ZA26 Screws To Roof Beam (12) (24) Install a left roof panel at the left rear corner of the roof.
  • Page 30 Step 17  Parts Needed For   Skylight Assembly (2) Roof Assembly  6868 Ridge Cap (1) ZA27 (16) Install two skylight assemblies as you unroll the weather stripping tape, and press it down, install the second ridge cap 6868 overlapping the fi rst ridge cap.
  • Page 31  7743 Roof Panel (2) Step 18  Parts Needed For   9087 Left Roof Panel (1) Roof Assembly 6869 Ridge Cap (1) ZA28 9086 Right Roof Panel (1) (22) (72) Install two roof panels, left roof panel, ridge cap 6869 and right roof panel on the front of the roof as before.
  • Page 32 Step 19  Parts Needed For   6015 Side Roof Trim (4) Roof Trim 6014 Side Roof Trim (2) XN29 Attach the side roof trim pieces to the lower end of the roof panels on each side of the building using screws at each panel overlap.
  • Page 33  3719 Door Handle Brace (2) Step 20  Parts Needed For   10472 Right and Left Doors (2) Door Assembly  10497 Horizontal Door Brace (4) XN30  6301 Vertical Door Brace (2) (12) The steps on this page tell how to assemble the right door.
  • Page 34 Step 21  Parts Needed For   Right Door Assembly (1) Door Installation & Adjustment  Left Door Assembly (1) XN31 Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track.
  • Page 35 ANCHORING AND FLOOR FRAME ADG35 Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs 1.
  • Page 36 WDA1012 ADG36 720651015...