Step 1: Floor Frames
You will need for this page:
(QTY: 8)
1
Overlap two (2) Side Floor Frames as shown
and secure with four (4) bolts. Two (2) bolts
must enter from bottom.
2
Assemble a second Side Floor Frame
Assembly by repeating part 1. Check that the
fi nished length of the Assemblies is 141 5/8"
(359,7 cm). Set aside for use in Step 5.
141 5/8" 359,7 cm
Finished Length
4
10392
Side Floor
Frame
Bolts thru Top.
13
Washers are to be used on painted parts only.
Washers are not necessary on unpainted parts
and there are not enough to use on every screw
and bolt.
BUILD TWO (2) FRAMES
10392
Bolts thru Bottom.
Overlap Length
11 7/8" 30,2 cm
13AW
10392