Overview

The DAC80501EVM is an easy to use platform for evaluating the functionality and performance of the
DAC80501 device. The DAC80501 is a single-channel, buffered, digital-to-analog converter (DAC) in 16-
bit resolution with 2.5-V internal reference. This EVM provides output voltage from 0 - 5V. It also provides
the SPI programming interface using a PC-based graphical user interface (GUI).
1.1
Kit Contents
Table 1
details the contents of the EVM kit. Contact the TI Product Information Center nearest you if any
component is missing. TI highly recommends that the user verify latest versions of the related software at
the TI website, www.ti.com.
1.2
Related Documentation from Texas Instruments
The following document provides information regarding Texas Instruments integrated circuits used in the
assembly of the DAC80501EVM. This user's guide is available from the TI web site under literature
number SLAU795. Any letter appended to the literature number corresponds to the document revision that
is current at the time of the writing of this document. Newer revisions may be available from the TI web
site at http://www.ti.com/, or call the Texas Instruments Literature Response Center at (800) 477-8924 or
the Product Information Center at (972) 644-5580. When ordering, identify the document by both title and
literature number.
SLAU795 – November 2018
Submit Documentation Feedback
Table 1. Contents of DAC80501EVM Kit
Item
DAC80501EVM evaluation board PCB
Table 2. Required Components Not Part of the
DAC80501EVM Kit
Item
USB2ANY interface adapter
Table 3. Related Documentation
Document
DAC80501
product data sheet
Copyright © 2018, Texas Instruments Incorporated
Quantity
1
Quantity
1
Literature Number
SBAS794
Overview
3
DAC80501EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC80501EVM and is the answer not in the manual?

This manual is also suitable for:

Dac80501

Table of Contents