Operating Mode/Status Description - Vertiv Liebert GXT-MT+10KVA User Manual

Table of Contents

Advertisement

26: L1 output voltage calibration
Interface
27: L2 output voltage calibration
Interface
28: L3 output voltage calibration
Interface

3-8. Operating Mode/Status Description

Following table shows LCD display for operating modes and status.
Operating
Description
mode/status
UPS Power On
When UPS is powered on, it will enter into this mode
for a few seconds for initializing the CPU and system.
Setting
Parameter 2:
It shows the internal measurement value of the output voltage,
and you can calibrate it by pressing Up or Down according to the
measurement from an external voltage meter. The calibration
result will be effective by pressing Enter. The calibration range is
limited within +/-9V. This function is normally used for parallel
operation.
Setting
Parameter 2:
It shows the internal measurement value of the output voltage,
and you can calibrate it by pressing Up or Down according to the
measurement from an external voltage meter. The calibration
result will be effective by pressing Enter. The calibration range is
limited within +/-9V. This function is normally used for parallel
operation.
Setting
Parameter 2:
It shows the internal measurement value of the output voltage,
and you can calibrate it by pressing Up or Down according to the
measurement from an external voltage meter. The calibration
result will be effective by pressing Enter. The calibration range is
limited within +/-9V. This function is normally used for parallel
operation.
26
LCD display

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents