Mounting the horizontal intake-exhaust kit Ø 80/125
(Fig. 20)
To install the kit Ø 80/125 one must use the flanged adapter kit in
order to install the flue system Ø 80/125.
1. Install the flanged adaptor (2) on the central hole of the boiler,
positioning gasket (1) with the circular projections down-
wards in contact with the boiler flange, and tighten using the
screws contained in the kit.
2. Engage the bend (3) with the male side (smooth) to the end stop
on the adapter (1).
3. Fit the Ø 80/125 (5) concentric terminal pipe with the male
side (smooth) to the female side of the bend (4) (with lip seals)
up to the end stop, making sure that the internal (6) and exter-
nal wall sealing plates (7) have been fitted; this will ensure
sealing and joining of the elements making up the kit.
3
4
2
1
The adapter kit includes (Fig. 20):
No.1 Gasket (1)
No.1 Adapter Ø 80/125 (2)
The Kit Ø 80/125 includes (Fig. 20):
No.1 Concentric bend Ø 80/125 at 87° (3)
No.1 Int./exhaust concentric terminal Ø 80/125 (4)
No.1 Internal wall sealing plate (5)
No.1 External wall sealing plate (6)
The remaining kit components must not be used
26
5
6
Extensions for Ø 80/125 horizontal kit. Kit assembly (Fig. 21)
The kit with this configuration can be extended up to a max.
length of 32 m, including the terminal with grid and excluding the
concentric bend leaving the boiler.
If additional components are assembled, the length equivalent to
the maximum allowed must be subtracted.
In this case the special extensions must be requested.
C
13
1.17 CONCENTRIC VERTICAL KIT
INSTALLATION
Type C configuration, sealed chamber and fan assisted
Concentric vertical intake and exhaust kit.
20
This vertical terminal is connected directly to the outside of the
building for air intake and flue gas exhaust.
The vertical kit with aluminium tile enables installation
on terraces and roofs with a maximum slope of 45% (ap-
prox. 25°) and the height between the terminal cap and
half-shell (374 mm for Ø 60/100 and 260 mm for
Ø 80/125) must always be observed.
Mounting the vertical kit with aluminium tile Ø 60/100
(Fig. 22)
1. Install the concentric flange (2) on the central hole of the boil-
er, positioning gasket (1) with the circular projections down-
wards in contact with the boiler flange.
2. Tighten the concentric flange with the screws in the kit.
3. Replace the tiles with the aluminium sheet (4), shaping it to
ensure that rainwater runs off.
4. Position the fixed half-shell (6) on the aluminium tile.
5. Insert the intake-exhaust pipe (5).
6. Fit the Ø 60/100 concentric terminal pipe with the male side
(5) (smooth) into the flange (2) up to the end stop, making sure
that the wall sealing plate has been fitted (3); this will ensure
sealing and joining of the elements making up the kit.
When the boiler is installed in areas where very cold
temperatures can be reached, a special anti-freeze kit is
available that can be installed as an alternative to the
standard kit.
C
13
21