Quick Guide - Seeley Convair CTA250 Installation & Operation Manual

Evaporative cooler
Table of Contents

Advertisement

QUICK GUIDE

Step 1
SAFETY
Read & understand the safety section.
Step 7
SECURE ROOF JACK &
TRANSITION
Use the TEK screws provided. Break the
transport clips for the weatherdamper.
Step 13
ILL969-C
INSTALL FLOAT VALVE
Assemble the float valve to the cooler.
Ensure all washers and o-rings are in
place. No thread tape is required.
Step 19
SET THE WATER LEVEL
Turn on the mains water and adjust the
float to allow water to fill to the required
level.
|
2
Step 2
COOLER LOCATION
Check cooler location. Consider
regulations. Discuss with customer.
Page 1
Step 8
FIT OPTION LEG SUPPORT
LOWER EVAPORATIVE
COOLER ONTO THE
TRANSITION
Page 5
ROOFING STRUCTURE
Step 14
ENGINEERS AND INSTALLERS PLEASE NOTE:
CONNECT MAINS WATER
THE BREEZAIR TBA COOLER
CURB AND DUCT FOR ITS MAJOR ATTACHMENT
TO THE BUILDING.
Use the supplied fittings.
THE LEGS SHOWN ON THIS DRAWING HAVE NO
PERFORMANCE RATINGS FOR DOWN-LOAD OR
WIND-LOAD.
Page 10
Step 20
COMMISSIONING THE COOLER
Switch the mains power on and test run
the cooler.
Page 12
Page 4
Page 7
MUST
RELY ON THE
ILL3404-A
Page 10
Page 13
Step 3
REMOVE VENTURI
Press the clip or remove the screws on
both sides of the venturi to release.
Step 9
CONVEY COOLER TO ROOF
Always use 2 persons to position the
cooler when handling manually.
Step 15
INSTALL BLEED FUNNEL
Never drain waste water directly onto the
roof. Be sure to use supplied 'O' Rings
and fittings.
Step 21
FINAL CHECK
Complete the commissioning checklist at
the end of this document.
Page 4
Page 7
Page 11
Page 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Convair cta500

Table of Contents