Electrical Requirements - Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM Installation And Operating Manual

With smart funnel
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS

ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. This brewer comes with an attached cordset.
4. Remove the front panel beneath the sprayhead.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace
the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up .
L2 RED
L1 BLACK
Requires 2-wire, grounded service
rated 200 or 240 volts ac, 20 amp,
single phase, 50/60 Hz.
Page 6
P2166
37467 110904

Advertisement

Table of Contents
loading

This manual is also suitable for:

Single multi-brew wise dbc

Table of Contents

Save PDF