Bunn ICB Operating & Service Manual

Bunn ICB Operating & Service Manual

Infusion series with smart funnel

Advertisement

ICB
ICB-DV
Infusion Series
®
with Smart Funnel
®
OPERATING & SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To obtain the Illustrated Parts Catalog, visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the
quickest way to obtain the catalog. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to obtain a paper copy of the
required Illustrated Parts Catalog mailed via U.S. Postal Service
www.bunn.com
37077.0000F
03/08 ©2004 Bunn-O-Matic Corporation

Advertisement

Table of Contents
loading

Summary of Contents for Bunn ICB

  • Page 1 PHONE: (217) 529-6601 FAX: (217) 529-6644 To obtain the Illustrated Parts Catalog, visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the catalog. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to obtain a paper copy of the required Illustrated Parts Catalog mailed via U.S.
  • Page 2: Warranty

    SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
  • Page 3: Table Of Contents

    Viewing Assigned Recipes and Asset Number ...9 Coffee Brewing ...10 Cleaning ...11 Glossary ...12 Programming ...14 Troubleshooting ...55 Wiring Diagrams ...69 ICB-DV ... Dual Voltage Machine ICBA ... 230 Volt Machine ICBB ... 200 Volt Machine INTRODUCTION CONTENTS Page 3 37077 101205...
  • Page 4: User Notices

    Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condition. Replace any unreadable or damaged labels. #00656.0000 #00658.0000 For 120/208V or 120/240 volt operation, replace Power Supply Cord only with Bunn-O-Matic part number 01699.0000. #34072.0000 USER NOTICES #37881.0000 #29710.0011 Page 4 #00986.0000...
  • Page 5 USER NOTICES (CONT.) 120/208V 120/240V 120V #34056.0001 FOR USE ONLY ON AN INDIVIDUAL BRANCH CIRCUIT RATED 20 AMPS #00985.0000 WARNING • FILL WATER TANK BEFORE ENERGIZING • DO NOT OVERLOAD CIRCUIT • KEEP AWAY FROM COMBUSTIBLES • DO NOT DEFORM PLUG OR CORD INSTRUCTIONS •...
  • Page 6: Electrical Requirements

    ELECTRICAL REQUIREMENTS WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up. Requirements for brewers without an attached cord set are as follows: Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. 120V.
  • Page 7: Plumbing Requirements

    A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
  • Page 8: Operating Controls

    A. ON/OFF SWITCH Pressing the "ON/OFF" pad will alternately turn the brewer on and off. Pressing this pad during the brew cycle will interrupt the brew cycle, stopping the flow of water. Pressing this pad during programming of the brewer will exit the setup and return to the main screen.
  • Page 9: Initial Set-Up

    Insert an empty funnel into the funnel rails. Place an empty server under the funnel. Connect the brewer to the power source. Make sure the ON/OFF switch is ON (LED will be lit). Water will flow into the tank and stop when the tank is filled to its capacity.
  • Page 10: Coffee Brewing

    WITHOUT A SMART FUNNEL AND MHG or DBC GRINDER: 1. Begin each brew cycle with a clean empty brew funnel. 2. Insert a BUNN filter into the funnel. 3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.
  • Page 11: Cleaning

    1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device. 2. Check and clean each sprayhead. The sprayhead holes must always remain open.
  • Page 12: Glossary

    GLOSSARY AD CARD: An assembly consisting of computer chips and an instruction label. Used for loading advertising messages into the brewer. AUTO PULSE BREW SETUP: The setting of a pulse brew routine by entering in the total desired water delivery time.
  • Page 13 GLOSSARY (Continued) RECIPE: Set of brewing parameters stored in the brewer. The parameters are unique for each coffee name. Coffee recipes include brew ounces, bypass percentages, pulse brew or pre-infusion and drip time. RECIPE CARD: An assembly consisting of a computer chip and an instruction label. Used for loading a recipe into the brewer and the companion DBC or MHG Grinder.
  • Page 14: Programming

    Using the menu-driven display on the front of the brewer, the operator has the ability to alter or modify various brewing parameters such as brew temperatures, brew volumes, bypass percentages, pulse brew, etc. This allows for the precise brewing of various flavors of coffee. Programming of the brewer is achieved by entering a certain function.
  • Page 15: Programming The Brewer

    The programming of the brewer is divided into two levels. There is one function in Level 1. All other functions are accessed in Level 2. The following function screens are in order of appearance. Each screen will have instructions on how to access and the procedures for programming the various functions of the brewer.
  • Page 16 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - FLOW CHART PROGRAMMING FUNCTIONS - LEVEL I PROGRAMMING FUNCTIONS - LEVEL 2 SET LANGUAGE? BREW BREW BREW SET NEW RECIPE? BREW BREW BREW ENABLE SANITATION DONE BREW BREW BREW SPRAY OZ/M: XX.X DONE BREW BREW BREW...
  • Page 17: Brew Lockout

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL I BREW LOCKOUT This function allows the operator to prevent or allow brewing if the water temperature is less than the set READY temperature. Procedure for setting Brew Lockout: 1. To access this function screen press and hold the right hidden button. Release when the display reads: 2.
  • Page 18: Set Language

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) The functions in the second level of programming allow the operator to adjust brew settings and other feature options. To access the level 2 function screens press and hold the right hidden button. Release when the display reads: SET LANGUAGE This function allows the operator to select the language used for the display.
  • Page 19: Units

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) UNITS This function allows the operator to select if numeric settings are displayed in English or Metric units. Procedure for setting the Units: 1. Press and hold the right hidden button until the display reads SET LANGUAGE? Press and release the right hidden button until the display reads UNITS.
  • Page 20: Review Recipes

    ALL BREW SETTINGS FOR THAT RECIPE DON'T KNOW GO TO SET NEW RECIPE, PAGE 21 AND FOLLOW THE INSTRUCTIONS REFER TO NAME LIST IN GRINDER MANUAL CONTACT BUNN-O-MATIC FOR ASSISTANCE Page 20 REVIEW RECIPES BREW BREW BREW NO NAME COFFEE...
  • Page 21: Assign Recipe

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ASSIGN RECIPE This function allows the operator to assign recipes to the three brew buttons. Standard recipes and any saved recipes from a Smart Funnel or Recipe Card can be assigned to a brew button. Only one recipe per brew button is allowed, for a total three recipes available to brew.
  • Page 22: Set New Recipe

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPE (to set a new COFFEE recipe using a Smart Funnel or RECIPE CARD) Using a Smart Funnel and a G9-2T DBC or MHG Grinder: This function allows the operator to set BREW VOL- UMES, BYPASS PERCENTAGE, PULSE BREW TIMES AND DRIP OUT TIMES for each coffee name preset in the grinder’s memory.
  • Page 23 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Procedure for Setting the Recipe: NOTE: Before beginning setup, place a server beneath the brew funnel. 1. Insert the funnel into the grinder and select the small batch size to grind. It is not necessary to have coffee beans in the hopper(s) in order to program the brewer.
  • Page 24 VOLUMES, PULSE BREW TIMES and DRIP OUT TIME for that particular coffee name. These can all be loaded in seconds. Contact Bunn-O-Matic Corporation for the availability of RECIPE CARDS and the RECIPE WRITER used to program the RECIPE CARDS. NOTE: Instructions to program the brewer and grinder are printed on the RECIPE CARD, along with the coffee name that is being programmed.
  • Page 25 VOLUMES, PULSE BREW TIMES and DRIP OUT TIME for that particular coffee name. These can all be loaded in seconds. Contact Bunn-O-Matic Corporation for the availability of RECIPE CARDS and the RECIPE WRITER used to program the RECIPE CARDS. NOTE: Instructions to program the brewer and grinder are printed on the RECIPE CARD, along with the coffee name that is being programmed.
  • Page 26 SET NEW RECIPE If not using a Smart Funnel and/or a G9-2T DBC or MGH Grinder and/or a Recipe Card It is possible to operate the brewer without using a Smart Funnel and/or G9-2T DBC or MHG Grinder. If a standard funnel or if a non-DBC grinder is used the brewer will automatically select the standard NO NAME COFFEE recipe when the assigned brew button is pressed.
  • Page 27: Brew Oz

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Procedure for modifying COFFEE recipes: Coffee recipes: BREW OZ: Range: OFF, 10.0 oz to 224.0 oz (.3-6.6 L) for both batch sizes This function allows adjustment of the brew volumes for each batch.
  • Page 28: Bypass

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Coffee recipes: %BYPASS: Range: 0 to 90% for both batch sizes This function allows adjustment of the amount of water that bypasses the grounds. The number signifies the percentage of the brew volume which does not flow over the coffee grounds.
  • Page 29 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) COFFEE RECIPES: SET PULSE BREW/PREINFUSION This function allows the operator to program the brewer to “pulse” the sprayhead flow on and off during a brew cycle (start and stop the flow of water out of the spray- head).
  • Page 30 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Setting Pulse Brew – EASY Pulse Brew NOTE: If the brewer is already on the SET PULSE BREW screen, skip steps 1 through 6, and proceed directly to step 7. 1.
  • Page 31 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Setting PulseBrew/Preinfusion – MANUAL Pulse Brew NOTE: If the brewer is already on the SET PULSE BREW screen, skip steps 1 through 6, and proceed directly to step 7. 1. Press and hold the right hidden button until the dis- play reads SET LANGUAGE.
  • Page 32: Pulse Brew

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) REVIEW RECIPES BREW BREW BREW PRESSING NO WILL NO NAME COFFEE ADVANCE TO NEXT MODIFY SHOW NEXT FUNCTION SCREEN ADVANCE TO THE BREW BREW RECIPE TO BE MODIFIED (RECIPE NAME) MODIFY SHOW NEXT BREW BREW...
  • Page 33: Drip Time

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) COFFEE RECIPES: DRIP TIME This function allows the operator to adjust the DRIP TIME (time from end of sprayhead flow to when liquid stops dripping from the funnel). When the brew cycle is complete, the display will show DRIPPING and will countdown the time until the funnel empties.
  • Page 34: Set Temp: 200

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET TEMP This function allows the operator to adjust the brew water temperature in the tank. This also sets the hot water faucet dispense temperature. Procedure for setting the Set Temp Range: 185°...
  • Page 35 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ENABLE ADS This function allows the operator to choose whether or not to display an advertising message. An ad can be saved to the brewer by either writing the ad using the programming commands, or by entering the ad into the brewer using an AD CARD.
  • Page 36: Enable Sanitation

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ENABLE ADS (Continued) Procedure to READ in a New Ad: NOTE: Saving a new ad will erase any previously saved ad in the brewer’s memory. 1. From the NEW AD? screen, press and release CARD.
  • Page 37: Enable Energy Saver

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ENABL SANITATION This function allows the operator to enable the sanita- tion function and set the time before a cleaning alert will be displayed. Procedure for enabling sanitation Range: 0.0 to 72.0 hrs 1.
  • Page 38 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ENABLE ENERGYSAVR This function allows the operator to enable the mode function and set the idle time. Once the set idle time has expired, the operator can choose to have the heat- ers either turn off, or reduce the tank holding temp to 140°...
  • Page 39 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ENABLE FRESH TIMER This function allows the operator to enable the Freshness Alert and set the expiration time. The expiration time is the amount of time the product is allowed to sit in the server/dispenser before a fresh batch is brewed.
  • Page 40: Refill

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) REFILL Range: 0 to 155 This function allows the operator to adjust the sensitiv- ity of the refill circuit. This is mainly a troubleshooting feature. Water in different geographical locations can have different conductivities.
  • Page 41 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SPRAY OZ/M This function allows the operator to view or to enter the actual flow rate coming out of the sprayhead. This is NOT used to calibrate the actual flow rate, but to tell the internal controller how fast the water is flowing.
  • Page 42: Calibrate Flow

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) BYPASS OZ/M This function allows the operator to view or to enter the actual flow rate coming out of the bypass nozzle. This is NOT used to calibrate the actual flow rate, but to tell the internal controller how fast the water is flowing.
  • Page 43 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) CALIBRATE FLOW This function allows the operator to enter the actual flow rate of the sprayhead and the bypass by dispens- ing both separately for one minute. The volumes are then entered into the brewer.
  • Page 44 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) CALIBRATE FLOW (Continued) Procedure to calibrate the bypass flow rate: 1. Place a container, accurately graduated and with a minimum capacity of 60 ounces, beneath the fun- nel. NOTE: If the display is already on the BYPASS CAL screen, skip steps 2 &...
  • Page 45: Brew Counters

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) BREW COUNTERS This function allows the operator to track the total num- ber of brew cycles completed, as well as the number of batches brewed using each of the brew buttons. There are three resettable counters, and one life counter that is not resettable.
  • Page 46: Asset Number

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) ASSET NUMBER This function allows the operator to enter in the ma- chine's asset number. This can be useful for tracking the usage or service of an individual machine within a group.
  • Page 47: Service Number

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SERVICE NUMBER This function allows the operator to enter in the tele- phone number to call if service is needed. The service number will be displayed anytime there is a fault mes- sage displayed (SeeTroubleshooting on page 56).
  • Page 48 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SERVICE TOOLS This function allows the testing of individual components and the ability to check switches for proper function. This function also tests the funnel sensor coil’s frequency (diagnostic tool for troubleshooting purposes only). Procedure to test components and outputs: The following components can be individually tested: Brew Valve...
  • Page 49: Brew Valve

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) PRESSING NO WILL ADVANCE TO FACTORY DEFAULTS PRESSING NO WILL ADVANCE TO TEST SWITCHES SERVICE TOOLS? BREW BREW BREW TEST OUTPUTS? BREW BREW BREW BREW VALVE NEXT BREW BREW BREW BYPASS VALVE NEXT BREW...
  • Page 50: Test Switches

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Procedure to test switches: The following switches can be individually tested: Half Batch Full Batch Left Hidden Brew A Brew B Brew C On/Off 1. Press and hold the right hidden button until the dis- play reads SET LANGUAGE.
  • Page 51 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) Procedure to test coil frequency: 1. Press and hold the right hidden button until the dis- play reads SET LANGUAGE. Press the right hidden button until the display reads SERVICE TOOLS. 2.
  • Page 52: Factory Defaults

    PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) FACTORY DEFAULTS This function allows the operator to erase ALL of the previously entered recipes and ad messages. Factory- set default values will replace ALL previous settings. Procedure to set factory defaults: 1.
  • Page 53 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) FACTORY DEFAULT VALUES Brew Lockout - Enabled Language - English Units - English SWITCH RECIPE Brew A – REGULAR Brew B – DECAF Brew C – BREAKFAST BLEND NO-NAME COFFEE RECIPE: BREW VOLUMES Half Batch –...
  • Page 54 PROGRAMMING THE BREWER (cont.) PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) FACTORY DEFAULT VALUES (Continued) DECAF RECIPE: BREW VOLUMES Half Batch – 64 OZ Full Batch – 128 OZ % BYPASS Half Batch – 0 % Full Batch – 20 % PULSE BREW TIMES Half Batch –...
  • Page 55: Troubleshooting

    A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department. • Inspection, testing, and repair of electrical equipment should be performed only by qualified service person- nel.
  • Page 56 TROUBLESHOOTING (cont.) PROBLEM Temperature Too Low Heating Time Too Long Fill Time Too Long Temp Sensor Out Of Range, Check For Bad Connections Temp Sensor Out Of Range, Check Wire For Shorts Equipment will not operate PROBABLE CAUSE 1. Water temperature in the tank does not meet the ready tempera- ture.
  • Page 57 TROUBLESHOOTING (cont.) PROBLEM Brew cycle will not start PROBABLE CAUSE 1. No water 2. No power or incorrect voltage to the brewer 3. ON/OFF switch 4. Brew switch 5. Brew valve 6. Control Board Page 57 REMEDY Check plumbing and shut-off valves Check for voltage across the termi- nals at the terminal block.
  • Page 58 TROUBLESHOOTING (cont.) PROBLEM Automatic refill will not operate or display shows FILL TIME TOO LONG PROBABLE CAUSE 1. No water 2. Tank drain clamp 3. Water Strainer 4. Refill probe or Sensitivity set- ting 5. Refill valve Page 58 REMEDY Check plumbing and shut-off valves Check tank drain clamp...
  • Page 59 TROUBLESHOOTING (cont.) PROBLEM Automatic refill will not operate or display shows FILL TIME TOO LONG (Continued) PROBABLE CAUSE 5. Refill valve (Continued) 6. Control Board 7. ON/OFF Switch Page 59 REMEDY Refill valve – Disconnect the brewer from the power source and remove wires from refill valve coil.
  • Page 60 TROUBLESHOOTING (cont.) PROBLEM Water flows into tank continuously with power removed from brewer. PROBABLE CAUSE 1. Refill valve 2. Refill probe or sensitivity set- ting 3. Control Board Page 60 REMEDY Foreign material lodged in valve, holding it in open state. Check the sensitivity setting.
  • Page 61 TROUBLESHOOTING (cont.) PROBLEM Water will not heat or display shows HEATING TIME TOO LONG. PROBABLE CAUSE 1. Limit Thermostat 2. Temperature probe 3. Toggle switch (Dual Voltage) Page 61 REMEDY Remove power from the brewer. Check for continuity through the limit thermostat.
  • Page 62 TROUBLESHOOTING (cont.) PROBLEM Water will not heat or display shows HEATING TIME TOO LONG. (Continued) PROBABLE CAUSE 4. Tank heaters 5. Control Board Page 62 REMEDY Remove power from the brewer. Check for continuity between the white terminal of the terminal block (or red terminal on 208/240V mod- els) and the black wire on the relay on the control board (Toggle switch...
  • Page 63 TROUBLESHOOTING (cont.) PROBLEM No bypass water PROBABLE CAUSE 1. Bypass valve 2. Recipe settings Page 63 REMEDY Test the bypass valve. Refer to the test outputs procedures on page Check to make sure bypass % has been set for the current recipe. 37077 091704...
  • Page 64 TROUBLESHOOTING (cont.) PROBLEM Spitting or unusual steaming from sprayhead or air vent. PROBABLE CAUSE 1. Lime buildup 2. Temperature probe 3. Control Board Page 64 REMEDY Inspect the probe and tank assembly for excessive lime deposits. Delime as required. Remove the probe from the grom- met and submerge in a water bath of approximately 70°F (21°C).
  • Page 65 TROUBLESHOOTING (cont.) PROBLEM Inconsistent beverage level in server/dispenser PROBABLE CAUSE Strainer Improper water pressure Brew valve Bypass valve Lime buildup Brew volume adjustment Page 65 REMEDY Direction of flow arrow must be pointing towards the brewer. Re- move the strainer and check for obstructions.
  • Page 66 1. Beverage left in server from previous brew 2. Brew volume adjustment Page 66 REMEDY Repair or replace leaky valve BUNN paper filters should be used for proper extraction Check sprayhead The brew cycle should be started only with an empty server under the funnel.
  • Page 67 4. Funnel Loading 5. Water temperature 6. Incorrect recipe Page 67 REMEDY BUNN paper filters should be used for proper extraction For coffee, a sufficient quantity of fresh drip or regular grind should be used for proper extraction. Bunn-O-Matic sprayhead should...
  • Page 68 TROUBLESHOOTING (cont.) PROBLEM Brewer is making unusual noises. PROBABLE CAUSE 1. Solenoids 2. Plumbing lines 3. Water supply 4. Tank heaters Page 68 REMEDY The mounting screws on the so- lenoids must be tight or they will vibrate during operation Plumbing lines should not be resting on the countertop.
  • Page 69: Wiring Diagrams

    SCHEMATIC WIRING DIAGRAM ICB-DV LIMIT THERMOSTAT BLK-14 BLU-14 BLK-14 FUNNEL SENSOR J1-1 J1-2 WHI/VIO BLU-14 BLK-14 N.O. WHI/RED J17-1 WHI/GRN WHI/BLU J17-5 J17-10 BRN/BLK BRN/WHI J17-14 J15-1 TRANSFORMER 10VA J15-5 J13-1 LEVEL PROBE J3-1 J3-5 J3-8 CONTROL PANEL ASSY J2-1...
  • Page 70 SCHEMATIC WIRING DIAGRAM iCBA, iCBB 200V AC 2 WIRE 230V AC 2 WIRE SINGLE PHASE Page 70 37077 030405...

This manual is also suitable for:

Icb-dv

Table of Contents