Monitoring Of Test Resources; Basic Safety Precautions; Pay Attention To The Instructions In The Operation Manual; Personnel Training - KERN CIB Operating Manual

Counting balances
Table of Contents

Advertisement

3.4 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the balance
and, if applicable, the testing weight, must be checked regularly. The responsible user
must define a suitable interval as well as type and scope of this test. Information is
available on KERN's home page (www.kern-sohn.com) with regard to the monitoring
of balance test substances and the test weights required for this. In KERN's accredited
calibration laboratory test weights and balances may be calibrated (return to the
national standard) fast and at moderate cost.

4 Basic Safety Precautions

4.1 Pay attention to the instructions in the Operation Manual

 Carefully read this operation manual before setup and
commissioning, even if you are already familiar with KERN balances.

4.2 Personnel training

The appliance may only be operated and maintained by trained personnel.

5 Transport and storage

5.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the appliance
itself when unpacking, for possible visible damage.

5.2 Packaging / return transport

 Keep all parts of the original packaging for a possibly
required return.
 Only use original packaging for returning.
 Prior to dispatch disconnect all cables and remove
loose/mobile parts.
 Reattach possibly supplied transport securing devices.
 Secure all parts such as the glass wind screen, the
weighing platform, power unit etc. against shifting and
damage.
12
CIB-BA-e-2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tcib 3k-4-aTcib 6k-4-aTcib 15k-3-aTcib 30k-3-a

Table of Contents