Panasonic PAW-160MAH2L Installation Instructions Manual page 110

Air handling unit kit
Table of Contents

Advertisement

Control
Case 3: 0–10 V demand control by an external BMS (available in medium and
To set the CZ-CAPBC2 PCB (ACC-SP1A) for 0–10 V demand control by an external building
management system (BMS), perfom the following steps:
1. Open the AHU Kit enclosure (see →
2. Only in case the setting of switch S3 must be modified, remove the upper mounting board.
7
110
advanced version only)
p.
48).
Otherwise, proceed with step 3.
a. On the CZ-CAPBC2 PCB (ACC-SP1A), located on the rear side of the upper mounting
board, set switch S3 to "VOLTAGE" or "NO VOLTAGE", depending on the BMS digital input
(DI) configuration.
Control via dry contacts (factory default)
= "NO VOLTAGE"
b. Restore and fasten the upper mounting board in its original position.
c. On the terminal connector of Section C, located on the upper mounting board inside the
AHU Kit enclosure (see diagram below), connect the digital inputs (DI) as follows:
● Heating start to COM and DI1
● Cooling start to COM and DI2
● Fan mode (free cooling) start to COM and DI3
● All DI contacts open = Stop
4.1.1 Installation of AHU Kit – MAH2/PAH2 – step 3,
Control via 12 – 24 V DC signals
= "VOLTAGE"
AHU Kit – Installation Instructions – 09/2021
12 –24 V DC
GND

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents