Chapter 4: Installing the Switch in an Equipment Rack

Beginning the Installation

Required Items

Switch
Orientations in
the Equipment
Rack
52
This chapter contains the procedure for installing the switch in a standard
19-inch equipment rack, with the brackets included with the unit.
The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
The switch has two sets of four screw holes on the left and right sides, for
attaching the brackets. Refer to Figure 19.
Figure 19. Bracket Holes on the Switch
You can use the sets of holes on the switch to install the switch in the
equipment rack in different orientations. You can install it with the front
panel flush with, extending in front of, or recessed behind the front of the
equipment rack. Refer to Figure 20 on page 53.
Bracket Holes