CABINET PREPARATION
6. Cut the openings for the following installation:
I Standard counter top installation, see Fig. 8A
I Deep counter or island installation, see Fig. 8B
NOTE:
If the deck is used, the sides or bottom of the cutout may be solid
combustible or non-combustible material. If the bottom is solid, provide
a 6" x 6" cutout in the left rear corner for the gas inlet and power cord
clearance. See Fig. 6.
Fig. 5
Counter-Sunk Screws
Counter-Sunk Screws
Front projects outward as shown
Front projects outward as shown
from standard depth cabinet.
from standard depth cabinet.
Flush with cabinets
Flush with cabinets
Front flush with cabinets; a minimum of 25-3/4"
Front flush with cabinets; a minimum
cabinet depth required
of 25
cabinet depth required
3/4"
Fig. 4
Cutout
6
Fig. 6
6
13