5-Positioning - RED COMPACT 18 Installation Manual

Pellet boiler
Hide thumbs Also See for COMPACT 18:
Table of Contents

Advertisement

5-POSITIONING

REQUIREMENTS FOR INSTALLATION OF THE PLANT - POSITIONING
The most important thing to do before installation of the boiler is to set aside a suitable area that meets the minimum requirements for
installation.
the minimum clearance in front of the product for the purpose of cleaning, maintenance, etc. must be 1000 mm;
the minimum permissible distance between the back of the product and a wall must be 500 mm;
the minimum distance between the top of the product and a wall (ceiling) must be 500 mm to ensure easy access to the heat
exchanger for cleaning and maintenance (e.g. for removing ash and possible installation of the pellet suction kit);
the minimum clearance between the product and the wall (side) must be 500 mm.
500
Technical Dept. - All rights reserved - Reproduction is prohibited
601
500
500
601
500
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compact 24

Table of Contents