RED COMPACT 18 Installation Manual page 25

Pellet boiler
Hide thumbs Also See for COMPACT 18:
Table of Contents

Advertisement

4-UNPACKING
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The boiler body or unit must always be kept in a
vertical position when moved, and only ever moved using suitable lifting trolleys.
The packaging materials are neither toxic nor harmful, and therefore no particular disposal measures are required.
After removing all the packaging, check that the boiler is complete and not damaged. If in doubt, contact the retailer.
As shown in figure 3, the product has a hook to lift up the boiler.
To use the hook, lift the front cover, take the hook from the bag with the instructions and secure it to the bracket under the front cover.
The following documents are provided in the package:
Instruction booklet
Inspection and maintenance report
Accessory
Technical Dept. - All rights reserved - Reproduction is prohibited
FIGURE 3 - LIFTING HOOK
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compact 24

Table of Contents