RED COMPACT 18 Installation Manual page 67

Pellet boiler
Hide thumbs Also See for COMPACT 18:
Table of Contents

Advertisement

15-CLEANING AND MAINTENANCE
PERIODIC CLEANING PERFORMED BY A QUALIFIED TECHNICIAN
Cleaning pipes
When the boiler is cold, lift the exchanger cover and the tank cover and remove the side panels (see the indications in the dedicated
paragraph). Unlock the fastening system of the turbulators as follows:
H
C1
Technical Dept. - All rights reserved - Reproduction is prohibited
K
W
r
K
C2
• Remove screw "r"
• Move lever "W" down to the ground
• remove the two elastic cotter pins "C1" and "C2"
• remove crank "K"
• remove pin "H" on the left-hand side of the boiler
H
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compact 24

Table of Contents