Maintenance And Inspection Calendar; Disposal - Darwin Fitness DF-MS30 Assembly And Operating Instructions Manual

Table of Contents

Advertisement

4.3

Maintenance and Inspection Calendar

To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Cables and pulleys
Screw connections
Pulleys and cables
Legend: C = clean; I = inspect
5

DISPOSAL

At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an electricals recycling centre. Further information can be
obtained from your local authority's recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
26
Weekly
Monthly
C/I
I
I
Quarterly
Half-yearly
Yearly

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ms30

Table of Contents