Chapter 3 Preventative Maintenance And Troubleshooting; Maintenance; Maintenance Records - Cleveland 24CGA10.2 Installation And Maintenance Instructions Manual

Dual gas steam generator & convection steamer
Hide thumbs Also See for 24CGA10.2:
Table of Contents

Advertisement

c) If the probe cylinder water level drops below the upper probe, 15 to 20 seconds later the
water fill valve opens and fills the generator. When the probe cylinder water level is above
the middle probe, the burners turn ON. A dull roaring sound indicates the burners are firing
and the unit is generating steam.
d) As the unit generates steam, the water level fluctuates and a clicking sound is heard as the
solenoid opens and closes the fill valve. The level in the cylinder rises and falls between the
upper and lower fill limit as the fill valve operates.
e) Check for steam leaks around the door.
f)
KEYPAD CONTROL
When the timer counts down to zero (00:00), the burners turn OFF, the condenser flow
stops, and the buzzer sounds continuously. Press the START/STOP key to silence the
buzzer.
DIAL TIMER CONTROL
When the timer counts down to zero, the burners turn OFF, the condenser flow stops, and
the buzzer sounds for 3 seconds.
g) After about 30 seconds steam stops entering the cooking compartment.
12). Turn the steamer OFF by turning the ON/OFF lever/switch counterclockwise to the OFF (top)
position. The red indicator light turns OFF immediately, and the automatic blowdown cycle
starts. DO NOT turn OFF the power at the main power switch until blowdown is complete. The
cycle takes about 3 minutes.
13). When blowdown is complete, turn the steamer OFF at the main power switch.
14). Install the side panels and secure them in place with the screws (See Figure 1-2 or 1-3). After
completing the Startup and Blowdown Inspection procedure, and the Operating Test procedure;
the steamer is ready for service. Refer to the separate OPERATORS MANUAL for complete
operating instructions.
CHAPTER 3 PREVENTATIVE MAINTENANCE AND
TROUBLESHOOTING
A. MAINTENANCE
Maintenance on the steamer must be performed on a regular basis to keep the unit running properly. Follow
the maintenance instructions in this chapter and problems will be kept to a minimum. As with any
preventative maintenance schedule, the frequency of steamer maintenance may need to be increased,
depending on equipment usage and water quality. If problems do occur, refer to the Troubleshooting Guide
in this chapter. For more information on product and services, contact your sales representative.
Instructions for the daily cleaning and operational maintenance and the weekly and monthly maintenance
required for this steamer can be found in the separate OPERATORS MANUAL. The maintenance described
in this manual should only be performed by qualified service or maintenance technicians, except as noted.

(1) Maintenance Records

Make a file solely for maintenance records. Keep a written record of daily, weekly, monthly, and yearly
maintenance. These records will protect warranty coverage, help personnel to know when to perform
various maintenance procedures, and assist service personnel.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gemini 24cga6.2Gemini 24cga10.2

Table of Contents