ETP48400-C9A2 Embedded Power
User Manual
Figure 4-12 Installing battery cables
(1) Battery string 1
----End
4.9 Installing AC Output Power Cables
Prerequisites
Procedure
Step 1 Remove the front panel of the AC PDU.
Issue 05 (2020-04-07)
Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No
operations allowed."
Switch off all circuit breakers before installing power cables.
Copyright © Huawei Technologies Co., Ltd.
4 Installation
39