Installing Power Cables And Signal Cables; Preparing Ac Input Cables And Connecting Waterproof Connectors; Connecting Cables Between The Function Module And Lithium Batteries - Huawei PowerCube 500 PC500-300H1 Quick Manual

Table of Contents

Advertisement

Preparing AC Input Cables and Connecting Waterproof Connectors

Flat-head
Scale line
screwdriver
(Unit: mm)

Installing Power Cables and Signal Cables

10.4
NOTICE
Ensure that caps and waterproof connectors are installed at all idle ports on the modules.
Installing an RJ45 Communications Cable for a Lithium Battery

Connecting Cables Between the Function Module and Lithium Batteries

PV input
AC input
Function module
Lithium battery
Lithium battery
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerCube 500 PC500-300H1 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Powercube 500 pc500-300g1

Table of Contents