8.9

Operation programme

8.9.1

Normal operation with preheating

Yellow
Flame loss during operation (Recycle max 3 attempts)
MV = still
Yellow
Signal not required
D7230
t1
Waiting time of a control box input signal: reaction time,
the control box stands still for the time t1.
t1I
Presence of extraneous light before the heat request: if
the presence of light during the t1l time, a block follows.
t2
Wait time after a request for heat:
the control box stays still for the t2 time.
t2I
Presence of extraneous light during the oil preheating:
if the presence of light lasts the t2l time, a block follows.
t2p
Maximum preheating time: if the thermostat K does not
make the switch within the time t2p a block follows, the
control box remains still for the time t2p.
t3
Pre-purging time
start of the fan motor.
t3I
Presence of an extraneous light during pre-purging.
immediate block.
Operation
Green
Green
Yellow
Yellow
Block
Green
Yellow
Yellow
Fig. 18
Key to lay-out
F
– Flame detector
I
– Ignition transformer
K
– Enabling switch thermostat for start up after preheating
LED
– Signal of operation status from reset button
MV
– Fan motor
PH
– Diesel oil heater
TL
– Limit thermostat
V1
– Oil valve
Red
Green + Yellow slow blinking
Green + Yellow fast blinking
Yellow
Green
Green + Yellow medium blinking
Red + Yellow fast blinking
Yellow fast blinking
Operating times
t1
max
t1I
max
t2
-
t2I
max
t2p
max
t3
-
t3I
max
The time is expressed in seconds
ts
Safety time:
if at the end of the ts time there is no flame, a block fol-
lows.
t4i
Transformer turn on time
total turn on time ts + t5i.
t5i
Transformer post- turn on time:
additional turn on time after ts.
t4I
Flame loss in operation:
maximum oil valve drop reaction time, after three recycle
attempts a block follows.
t6
Post-purging time:
additional purging time on the opening of the heat limit
thermostat (TL).
t6I
Presence of an extraneous light during post-purging. if
the presence of light lasts the t6l time, a block follows.
t7
Long pre-purging time
pre-purging time more than t3.
19
GB
1
ts
30
t4i
3
t5i
30
t4I
600
t6
15
t6I
1
t7
-
5
-
8
-
3
max
1
max
360
max
30
-
120
20013962

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Gulliver 20012189Gulliver 20015628

Table of Contents