Preparation Instructions; Fan Preparation - Casablanca Lanai Owner's Manual

Casablanca lanai ceiling fans: owners manual
Hide thumbs Also See for Lanai:
Table of Contents

Advertisement

Unpacking: Before assembling and installing your ceiling fan, remove all parts from the shipping cartons and check them
against the parts listed here. Before discarding packaging material, be certain that all parts have been removed.
ALLEN SET SCREW
1
1
-20 x
"
4
4
(PRE-INSTALLED)
Step A. Slide the downrod gasket onto the downrod as shown,
pushing the gasket so that it is snug with the ball of the
downrod.
IMPORTANT SAFETY INFORMATION!
BEFORE STARTING THE INSTALLATION OF YOUR CEILING FAN, INSTALL THE
THREADED DOWNROD INTO THE MOTOR COUPLING AND LOCK THE ASSEMBLY
Prepare for fan installation as follows:
Step B. Route the wires from the motor through the
Perma • Lock™ downrod and ball assembly.
Tip: The downrod has a tapered thread
that is designed to lock completely when
correctly installed.
Step C. Using the provided allen wrench, loosen the set screw
several turns to allow installation of the downrod. Thread
the downrod into the motor coupling until it stops turning,
this will take at least four and a half full turns.
Step D. Securely tighten the set screw with the provided allen
wrench to ensure safe operation of your fan.
CAUTION: Failure to fully lock in the down-
rod before securely tightening the allen set
screw may cause the fan to separate from
the downrod during normal operation!
Step E. Slide the downrod gasket down so that it fits snugly
against the motor casing as shown.

PREPARATION INSTRUCTIONS

PERMA•LOCK™ HARDWARE
3mm
ALLEN WRENCH
DOWNROD GASKET PREPARATION

FAN PREPARATION

DOWNROD GASKET PREPARATION
L
ANAI
DOWNROD
DOWNROD & BALL
GASKET
GROUND
WIRE
TAPERED
THREAD
ALLEN SET
SCREW
ASSEMBLY
MOTOR
WIRES
DOWNROD
& BALL
ASSEMBLY
DOWNROD
GASKET
MOTOR
COUPLING
3

Advertisement

Table of Contents
loading

Table of Contents