Preparing Cables - Nortel 1001t Installation Manual

Nortel symposium call center server
Table of Contents

Advertisement

Getting started

Preparing cables

Preparing cables
Purpose
What you need
Tips
Cable length chart
From
To
ELAN hub
M1 (AML link)
core 0
ELAN hub
M1 (AML link)
core 1
ELAN hub
Server
Standard 1.0
Follow this procedure to prepare cables for connecting
equipment to
the ELAN (embedded LAN for Nortel equipment only)
the CLAN (customer LAN for Symposium client PCs)
You need the tools and materials listed in the checklist in
Section B of this chapter, "Preparing for installation."
Mark the cable lengths on a copy of the Symposium Call Center
Server network diagram from Section A of this chapter,
"Introduction to Symposium Call Center Server."
Measure and prepare cables in advance, before the installation
date.
Use a tape measure to determine the required cable lengths and
record them in the chart below. Allow extra length for service
loops and trimming for connector preparation.
Cable type
10BaseT Class 5
10BaseT Class 5
10BaseT Class 5
Nortel Symposium Call Center Server
1001t Hardware Installation Guide
Length
Maximum length
100 m (328 ft) per
segment
100 m (328 ft) per
segment
100 m (328 ft) per
segment
1-29
May 1998

Advertisement

Table of Contents
loading

Table of Contents