IndraControl XFE 01.1 Extension Mod-
ules Profibus, RT-Ethernet, Sercos, CAN
1 About this documentation
Editions of this documentation
Edition
Release
Date
01
2014-10 First edition
02
2016-08 CAN modules and Sercos modules supplemented
03
2016-10 Corrections
04
2017-02 Explosion protection notes and type plate supplemented
05
2019-06 Standards and warning instructions modified for UL, explosion protection
Tab. 1-1: Change Record
1.1 Overview on target groups and product phases
In the following illustration, the framed activities, product phases and target
groups refer to the present documentation.
Example: In the product phase "Mounting (assembly/installation)", the target
group "mechanic/electrician" can execute the activity "install" using this
documentation.
Product
Selection
phases
Presales Aftersales
Design engineer
Programmer
Technologist
Target
Process
groups
specialist
Select
Prepare
Activities
Design
Construct
Fig. 1-1: Assigning the present documentation to the target groups, product phases and ac-
tivities of the target group
Note
notes removed
Mounting
Engineering
(assembly/installation)
Mechanic/
electrician
Commissioning engineer
Unpack
Parameterize
Mount
Program
Install
Configure
Simulate
About this documentation
Commissioning
Operation
Programmer
Technologist
Process specialist
Machine
operator
Maintenance
technician
Service
Optimize
Operate
Test
Maintain
Remove
Create
the NC program
R911345570_Edition 05 Bosch Rexroth AG
1/31
Decommissioning
Mechanic/
electrician
Disposal company
Dismount
Dispose
faults
Need help?
Do you have a question about the rexroth IndraControl XFE 01.1 and is the answer not in the manual?
Questions and answers