Commissioning
4.2 First startup
At first startup, user has to feed in AC power and switch on the manual switch
and DC Power Switch. Inverter will start up and LCD display panel will turn on
when powered on through AC. Please set language and the correct country
(Grid Code) according to your region.
Please make sure that there is no any error, fault or warning showing on home
page. Now you can feed in DC power and wait for inverter initially self-test
about 2 minutes. If there is enough power generated from PV array, inverter
will start feeding in power to grid.
The following Figure 4-2 illustrates the display flow charts of the inverter startup.
Select Language,
►
English
Deutsch
Français
EXIT
Select Grid Code,
►
CHINA 2013 230/400V
FR-Is 50Hz 230/400V
FR-Is 60Hz 230/400V
EXIT
Are you sure to
set Grid Code
►
Yes /
EXIT
Delta prot.
►
Sunspec prot.
Figure 4-2 : Grid Code, language and ID settings for first startup
ENT
ENT
:
XXX
No
ENT
EXIT
ENT
Are you sure to set
set protocol
►
Yes /
EXIT
Setting ID
EXIT
Are you sure to set
ID
:
1
►
Yes /
46
:
XXXXXX
No
ENT
:
ID = 001
ENT
No