Operational Verification; Performing A Blank Analysis - Micromeritics TriStar II 3020 Maintenance Instructions Manual

Hide thumbs Also See for TriStar II 3020:
Table of Contents

Advertisement

TriStar II 3020 Scheduled Maintenance Instructions

Operational Verification

Performing a Blank Analysis

1.
Install blank tubes with filler rods and isothermal jackets into each of the sample ports.
Be sure to use new O-rings on the sample tubes. Make sure the Dewar cover is attached.
(Verify that the isothermal jacket and filler rods are checked as being used in the sample
tube file.)
2.
Fill the Dewar with LN
Jun 09
and check the level using the dipstick.
2
Operational Verification
O-ring
Ferrule
Sample port nut
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TriStar II 3020 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents