Before Installation; Installation Procedure - NEC SL1000 Getting Started Manual

Hide thumbs Also See for SL1000:
Table of Contents

Advertisement

SL1000 Getting Started Guide

Before Installation

Installation Procedure

1. Unpack all items and
check
for
damaged
missing parts.
2. Are you are replacing an
existing telephone system
(Aspila Topaz, Xn120 or
IPC100) ???
3. Mount the SL1000 system
on the wall.
4. Connect the Telephones.
5. Connect the Trunk Lines.
6. Consider the operation
during power failure.
7. Secure the Cables.
8. Connect the AC Cord and
Switch on the SL1000 system.
9. Test the System.
10. Configure the SL1000
System to the customer's
requirements.
11. Install Optional Items.