Chapter 2. Installation; Shipping Contents; Installation Tools - Comtech EF Data LNAS Installation And Operation Manual

Low noise amplifier
Table of Contents

Advertisement

2.1

Shipping Contents

Inspect shipping containers for damage. If shipping containers are damaged, keep them until the
contents of the shipment have been carefully inspected and checked for normal operation.
The modulator and manual are packaged in pre-formed, reusable, cardboard cartons containing
foam spacing for maximum shipping protection.
CAUTION
Do not use any cutting tool that will extend more than 1-inch into the
container. This can cause damage to the LNA.
Do these steps:
1. Cut the tape at the top of the carton indicated by OPEN THIS END.
2. Remove the cardboard/foam space covering the LNA.
3. Remove the LNA from the carton.
4. Save the packing material for storage or reshipment purposes.
5. Inspect the equipment for any possible damage incurred during shipment.
6. Check the equipment against the packing list to ensure the shipment is correct.
7. Refer to the following chapters/sections for further installation instructions.
2.2

Installation Tools

No special tools are required.
Installation

Chapter 2. INSTALLATION

2–1
Low Noise Amplifier Series
Revision 2
MN-LNAS

Advertisement

Table of Contents
loading

Table of Contents