Download Print this page

Opex Sure Sort Operator's Manual page 8

Hide thumbs Also See for Sure Sort:

Advertisement

Available languages

Available languages

Document History
Doc
Date
Rev
19-01
Feb 25, 2019
19-02
Mar 14, 2019
4
Changes (click blue text to go to that page)
Preliminary Release
Initial release with the following updates:
- interior ground symbol for AC enclosure
Page 25
removed
- photo of high-leakage current label updated
Page 27
- machine ratings/SN labels updated
Page 28
- descriptions of left & right E-stops changed
Page 62
to 100 & 200 to match S/W diagnostics.
- step 7 revised to state pull up E-stop to
Page 63
deactivate; was twist. Added step 8: restart host
- Section 2.7 LOTO procedures updated:
Page 69
added EU lockout device; plug lockout device
procedure placed in separate section; "lockout switch"
changed to "main disconnect switch" handle; power
restoration steps moved to separate section
& 90- iBOT images updated
Page 86
- BTU specs removed
Page 99
& 102- NA & EU electrical req'mts updated
Page 101
- Compliance specs updated
Page 107
- corrected machine S/N location figure;
Page 109
updated label
- "lockout switch" changed to "main
Page 114
disconnect switch" handle
(continued next page)
Sure Sort™ Operator Manual
OPEX Corporation
Document History

Hide quick links:

Advertisement

loading
Need help?

Need help?

Do you have a question about the Sure Sort and is the answer not in the manual?

Questions and answers