Installing The Light Kit - HAMPTON BAY METARIE II 24 Use And Care Manual

Table of Contents

Advertisement

Assembly — Installing the Light Kit
Attaching the switch housing to
11
the mounting ring
CAUTION: Before starting installation, disconnect the
power by turning off the circuit breaker or removing the fuse
at the fuse box. Turning power off using the fan switch is not
sufficient to prevent electric shock.
Remove one of the three switch housing mounting screws
(LL) from the mounting ring (MM) and loosen the other two
screws (LL). (Do not remove.)
While holding the switch housing (H) under the fan motor
assembly (E), snap together the wire connection plugs (NN).
Place the key holes in the switch housing (H) over the two
screws (LL) previously loosened from the mounting ring
(MM). Turn the switch housing (H) until the switch housing
(H) locks in place at the narrow section of the key holes.
Securely tighten the two switch housing mounting screws
(LL) previously loosened and the one previously removed.
E
H
LL
MM
NN
Attaching the light kit to the
12
switch housing
Remove one of the four light kit mounting screws (OO) from
the switch housing (H) and loosen the other three screws
(OO). (Do not remove.)
While holding the LED light kit (I) under your fan motor
assembly (E), make the polarized plug connections (PP):
- White to white
- Blue to black
Carefully push all wires back into the switch housing (H).
Place the key holes in the LED light kit (I) over the three
mounting screws (OO) previously loosened from the switch
housing (H). Turn the LED light kit (I) until the LED light kit
locks in place at the narrow section of the key holes.
Secure by tightening the three light kit mounting screws
(OO) previously loosened and the one previously removed.
E
H
OO
14
PP
I

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yg922b-bnYg922b-eb1005 710 2781005 710 276

Table of Contents