Installing The Light Kit - HAMPTON BAY LELAND II Use And Care Manual

52 inch ceiling fan
Table of Contents

Advertisement

Assembly — Installing the Light Kit
Attaching the light kit mounting
11
plate to the mounting ring
Remove one of the three light kit mounting plate
screws (II) from the mounting ring (AAA) and loosen
the other two screws (II). (Do not remove.)
Place the key holes in the light kit mounting plate (I)
over the two screws (II) previously loosened from the
mounting ring (AAA). Turn the light kit mounting plate
(I) until the light kit mounting plate (I) locks in place
at the narrow section of the key holes.
Secure by tightening the two light kit mounting plate
screws (II) previously loosened and the one (II)
previously removed.
AAA
12
I
II
13
Attaching the light kit to
the light kit mounting plate
CAUTION:
Before starting installation, disconnect the
power by turning off the circuit breaker or removing the fuse
at the fuse box. Turning power off using the fan switch is not
sufficient to prevent electric shock.
Remove one of the three light kit mounting screws
(JJ) from the light kit mounting plate (I) and loosen
the other two screws (JJ). (Do not remove.)
While holding the light kit (J) under the fan motor
assembly (F), snap together the two wire connection
plugs (BBB).
Place the key holes in the light kit (J) over the two
screws (JJ) previously loosened from the light kit
mounting plate (I). Turn the light kit (J) until the light
kit (J) locks in place at the narrow section of the key
holes. Secure by tightening the two light kit mounting
screws (JJ) previously loosened and the one (JJ)
previously removed.
Please contact 1-877-527-0313 for further assistance.
F
BBB
I
J
JJ
HAMPTONBAY.COM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Al837-ob+gh593-549

Table of Contents