STEP 2
A.) Install Guide Rods (#7) into holes on bottom Frame using M10 x
80 Allen Bolt (#18) and Ø 10 Spring Washers (#25). Tighten bolts
now.
B.) Install Rubber Bumpers (#16) on each Guide Rod (#7). Slide
fifteen 10lb Weight Plates (#10) from the top of Guide Rods (#7)
down to the Rubber Bumpers (#16). Make sure the weight sticker
cut out is facing the inside of the machine.
C.) Remove the two M10 x 19 Allen Bolts (#21), Ø 10 Spring
Washers (#23), and Ø 10 Washers (#25) which were pre-
assembled in the factory to hold the Guide Rod Bracket (#6). Slide
the Selector Stem Assembly (#8) onto the Guide Rods (#7). Install
Large Pulley (#30) and wrap the cable between the U-shaped Pulley
Bracket (#27) using the M10 x 2 (#29) Allen Bolt located on the
Selector Steam Assembly (#8).
D.) Hold the Selector Stem Assembly (#8) above the weight stack
to make it easier to install Guide Rod Bracket (#6) on Guide Rods
(#7).
E.) Once the Guide Rod Bracket (#6) is installed onto the Guide
Rods (#7), Push the Guide Rod Bracket back into the upright.
F.) Secure the Bracket back to the upright frame with the two M10 x
19 Allen Bolts (#21), Ø 10 lock Washers (#23), Ø 10mm Washers
(#25).
G.) Lower the Selector Stem down onto the top of the weight stack.
H.) Check all the cables to make sure they are on track on the
pulleys.
I.) Peel off the weight resistance label from the Resistance Label
Set (#26) and attach to the plates.
J.) Insert the Weight Selector Pin (#9) into the weight stack.
K.) Lubricate the Guide Rods with super lube or lube provided in
Hardware Pack.
L.) If Needed, Adjust the Cable tension by first loosening the M10 x
2 (#29) Allen Bolt located on the Selector Steam Assembly (#8)
then rotate the Tension Adjustment Plate (#28) clock or
counterclockwise to move the Bolt and the Large Pulley (#30) up
and down along the open track inside the U-shaped Pulley Bracket
(#27). Once desired tension is achieved, securely tighten the Bolt
(#29) back.
M.) Repeat the Procedure A through N above to install the other set
of weight plates to the Left Station. (#2)