Commissioning ET 200eco PN M12-L on PROFINET IO

Introduction
The commissioning of your distributed I/O devices depends on the respective plant
configuration. The following procedure describes how to commission the
ET 200eco PN M12-L on an IO controller.
Requirements for commissioning on the PROFINET IO
Note
Performing tests
You must ensure the safety of your plant. You need to run a complete functional test and
perform the required safety checks before the commissioning of a plant.
Also allow for any possible foreseeable errors in the tests. This prevents you from putting
persons or equipment at risk during operation.
Procedure
The following table shows the chapters/documents in which the required actions are
described.
Table 6- 1
Step
1
2
3
4
5
Distributed I/O system ET 200eco PN M12-L
System Manual, 06/2021, A5E48753295-AC
Requirements for the ET 200eco PN M12-L on the PROFINET IO
Procedure
Mounting the ET 200eco PN M12-L
Wiring the ET 200eco PN M12-L
Configuring the ET 200eco PN M12-L
Switching on supply voltage for the IO
controller
IO controller is in RUN mode
Reference
Section Mounting (Page 18)
Section Connecting (Page 23)
Section Configuring (Page 46)
IO controller manual
IO controller manual
6
53

Advertisement

Table of Contents
loading

Table of Contents