Inspection of the installation
Current regulations require the heating installation to undergo an installation inspection before it is commissioned.
The inspection must be carried out by a suitably qualified person. In addition, fill in the page for information regarding
the installation data in the User Manual.
Description
✔
Ventilation
Filter section
Heat exchanger section
Fan section
Pressure sensor, exhaust air duct
Integral water seal
Flue gas extraction (option)
Exhaust air damper (option)
Brine
Non-return valves
System flushed
System vented
Antifreeze
Filterball (particle filter)
Safety valve
Shut off valves
Circulation pump setting
Heating medium
Non-return valves
System flushed
System vented
Expansion vessel
Filterball (particle filter)
Safety valve
Shut off valves
Circulation pump setting
Electricity (page 23)
Connections
Main voltage
Phase voltage
6
Chapter 1 |
Important information
Notes
Signature
Date
GreenMaster-HP