Section 3. Plumbing - Zodiac EziSalt Installation Manual

Table of Contents

Advertisement

EziSalt Saltwater Chlorinator | Installation Manual

Section 3. Plumbing

The cell must be plumbed in a position that is
accessible for maintenance and within 2 meters of
the controller. The cell should be the last piece of
equipment in the circulation system. The cell must
be installed horizontally, level and with correct fl ow
orientation, see Figure 3.
1.
If you intend to plumb the cell on a bypass,
the bypass must be equipped with Isolation
valves, see Figure 3.
2.
Plumb the cell inlet and outlet on vertical
lengths of 40 mm PVC pipe. The cell inlet and
outlet ports are 11.5 cm apart, see Figure 2.
The inlet of the cell is on the side closest to
the electrical lead, see Figure 4.
3.
Put the unions onto the inlet and outlet pipes,
see Figure 4.
4.
Glue the adapters directly onto the pipes.
5.
Ensure the o-rings are seated properly on the
adapters.
6.
Secure the cell to the plumbing by
tightening the unions hand tight. DO NOT
OVERTIGHTEN.
7.
Double check cell orientation. The cell inlet is
closest to the cell electrical lead.
Figure 3.
Plumbing Cell Only
SALTS
INFO
SALTS
INFO
LOW
LOW
BOOST
BOOST
MENU
MENU
OK
OK
Cell
Adapters
Unions
Figure 4.
Cell Plumbing Assembly
WARNING
• The cell must be installed horizontally and level.
Improper installation can lead to gas build up which
could result in equipment damage or serious injury.
• The cell must be the last piece of equipment on
the return line, see Figure 3.
• It is recommended in all installations that the cell is
installed on a bypass equipped with isolation valves,
see Figure 3.
• In order to avoid load loss, installing the cell on a
bypass is MANDATORY if system flow rated exceeds
300 Lpm, see Figure 3.
• If installing on a bypass, use a downstream check
valve instead of a manual valve to prevent improper
back flow into the cell.
Page 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ezisalt 24Ezisalt 40

Table of Contents